Section 10 (Air Conditioner - 911 CARRERA (996))
WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 2005 Porsche 911, 2004 Porsche 911, 2003 Porsche 911, 2002 Porsche 911, and 2001 Porsche 911. However, it is still accessible from the selected car via links, so may be relevant.
- Safety regulations when handling refrigerant R 134a
- Assembly work on the air-conditioning system
- Service unit SECU 134
- Assembly work involving the refrigerant system
- General assembly sequence
- Removing refrigerant by suction and cleaning
- Cleaning the refrigerant
- Draining off old refrigerant oil
- Evacuating
- Topping up with new refrigerant oil
- Filling via the high-pressure side
- Refilling the air-conditioning system
- Distribution of the oil quantity in the refrigerant circuit
- Nominal values for pressures and temperatures
- Removing and installing pressure switch for the air-conditioning system
- Removing and installing the fluid tank
- Removing and installing the compressor
- Removing and installing the expansion valve
- Installing and removing the heating/air-conditioning unit
- Removing and installing the condenser
- Removing and installing the magnetic coupling
- Removing and installing drive motors of the heating/air-conditioning unit
- Removing and Installing drive motor for fresh-air/recirculation valve
- Removing and installing outside temperature sensor
- Removing and installing interior temperature sensor
- Removing and installing footwell blower outlet sensor
- Removing and installing blower driver
- Removing and installing fan for condenser
- Removing and installing ballast resistor for fan motor
- Removing and installing heating/air-conditioning control
- Removing and installing compressor - GT3