LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2016 >> 911 Turbo, 2D Convertible >> Repair and Diagnosis >> External Pages >> Different car >> Section 10 (Air Conditioner - 911 CARRERA (996)) >> Assembly work on the air-conditioning system >> Assembly work involving the refrigerant system

Assembly work involving the refrigerant system

WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 2005 Porsche 911, 2004 Porsche 911, 2003 Porsche 911, 2002 Porsche 911, and 2001 Porsche 911. However, it is still accessible from the selected car via links, so may be relevant.

During all work on the air-conditioning system which necessitates opening the refrigerant system, the system contents must first be disposed of correctly. When doing so, follow the safety regulations.

Dirt and moisture must be kept out of the air-conditioning system's pipe system. Thorough cleanliness must therefore be ensured during all work. System components must never be cleaned on the inside with hot steam. Use only nitrogen for cleaning purposes.

When replacing a component, all openings must be closed off with suitable plugs.