Installation [10/2023 - ]: Procedure
- INSTALL ENGINE HANGER
Refer to PROCEDURE - Step 88
- REMOVE ENGINE STAND
- Attach an engine sling device and hang the engine with a chain block.NOTE:
Pay attention to the angle of the sling device as the engine assembly or engine hangers may be damaged or deformed if the angle is incorrect.
- Lift the engine and remove it from the engine stand.NOTE:
With the exception of installing the engine assembly to an engine stand or removing the engine assembly from an engine stand, do not perform any work on the engine while it is suspended, as doing so is dangerous.
- Place the engine onto a work bench.
- Attach an engine sling device and hang the engine with a chain block.
- INSTALL REAR ENGINE MOUNTING INSULATOR
Refer to PROCEDURE - Step 5
- INSTALL REAR ENGINE MOUNTING MEMBER
- INSTALL FRONT ENGINE MOUNTING INSULATOR
HINT:
Only perform this procedure when replacement of the engine mounting insulator is necessary.
- CONNECT FRONT FRAME ASSEMBLY
- INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL FRONT DRIVE SHAFT ASSEMBLY LH
Refer to PROCEDURE - Step 2
- INSTALL FRONT DRIVE SHAFT ASSEMBLY RH
Refer to PROCEDURE - Step 3
- INSTALL FLYWHEEL SUB-ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL TRANSMISSION INPUT DAMPER COVER ASSEMBLY
Refer to PROCEDURE - Step 3
- INSTALL HYBRID VEHICLE TRANSMISSION ASSEMBLY
Refer to INSTALLATION [10/2023 - ]
- INSTALL FLYWHEEL HOUSING SIDE COVER
Refer to PROCEDURE - Step 8
- TEMPORARILY INSTALL FRONT PROPELLER SHAFT ASSEMBLY
Refer to PROCEDURE - Step 1
- TIGHTEN FRONT PROPELLER SHAFT ASSEMBLY
Refer to PROCEDURE - Step 3
- INSTALL EXHAUST MANIFOLD ASSEMBLY LH
Refer to PROCEDURE - Step 5
- INSTALL EXHAUST MANIFOLD ASSEMBLY RH
Refer to PROCEDURE - Step 4
- CONNECT AIR FUEL RATIO SENSOR
Refer to PROCEDURE - Step 8
- INSTALL NO. 1 EGR PIPE
Refer to PROCEDURE - Step 5
- INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
- Install a new O-ring to the engine oil level dipstick guide.
- Apply a light coat of engine oil to the O-ring.
- Push in the engine oil level dipstick guide end into the guide hole.
- Install the engine oil level dipstick guide with the bolt.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- INSTALL ENGINE AND TRANSMISSION ASSEMBLY
- Set the engine on an engine lifter.NOTE:
- Place wooden blocks or plate lift attachments so that the engine is level.
- With the exception of installing the engine assembly to an engine stand or removing the engine assembly from an engine stand, do not perform any work on the engine while it is suspended, as doing so is dangerous.
- Never install attachments to the oil pan of the engine assembly or transmission as doing so may deform the oil pan.
Place Wooden Block or Plate Attachments - Operate the engine lifter and install the engine and transmission assembly to the vehicle.NOTE:
Make sure that the engine is clear of all wiring and hoses.
- Install the engine and transmission assembly to the vehicle with the 2 bolts and 2 nuts.
Bolt Nut Torque: 175.5 N.m (1790 kgf/cm, 129 ft.lbf)
- Install the rear engine mounting member with the 6 bolts.
Torque: 34.7 N.m (354 kgf/cm, 26 ft.lbf)
- Remove the 4 bolts and 2 engine hangers.
- Set the engine on an engine lifter.
- INSTALL NO. 2 GROUND WIRE
- CONNECT NO. 2 PARKING LOCK RELEASE CABLE ASSEMBLY
- Connect the parking lock release lever assembly cable end to the No. 2 parking lock release cable assembly cable end.
*1 Parking Lock Release Lever Assembly Cable End *2 No. 2 Parking Lock Release Cable Assembly Cable End - Attach the 2 claws and connect the cover to the No. 2 parking lock release cable assembly as shown in the illustration.
*1 Cover Connect
- Connect the parking lock release lever assembly cable end to the No. 2 parking lock release cable assembly cable end.
- CONNECT STEERING KNUCKLE LH
Refer to PROCEDURE - Step 5
- CONNECT STEERING KNUCKLE RH
HINT:
Install the RH side following the same procedure as for the LH side.
- CONNECT FRONT SHOCK ABSORBER ASSEMBLY LH
- CONNECT FRONT SHOCK ABSORBER ASSEMBLY RH
HINT:
Install the RH side following the same procedure as for the LH side.
- CONNECT TIE ROD ASSEMBLY LH
Refer to PROCEDURE - Step 2
- CONNECT TIE ROD ASSEMBLY RH
HINT:
Remove the RH side following the same procedure as for the LH side.
- INSTALL FRONT DISC BRAKE DUST COVER LH
Refer to PROCEDURE - Step 8
- INSTALL FRONT DISC BRAKE DUST COVER RH
HINT:
Remove the RH side following the same procedure as for the LH side.
- INSTALL FRONT DISC LH
- for 6-Pot Caliper:
Refer to PROCEDURE - Step 4
- except 6-Pot Caliper:
Refer to PROCEDURE - Step 1
- for 6-Pot Caliper:
- INSTALL FRONT DISC RH
HINT:
Remove the RH side following the same procedure as for the LH side.
- INSTALL FRONT DISC BRAKE CYLINDER ASSEMBLY LH
Refer to PROCEDURE - Step 13
- INSTALL FRONT DISC BRAKE CYLINDER ASSEMBLY RH
HINT:
Remove the RH side following the same procedure as for the LH side.
- INSTALL FRONT HEIGHT CONTROL SENSOR SUB-ASSEMBLY LH
Refer to PROCEDURE - Step 2
- INSTALL FRONT HEIGHT CONTROL SENSOR SUB-ASSEMBLY RH
HINT:
Remove the RH side following the same procedure as for the LH side.
- INSTALL FRONT AXLE SHAFT NUT LH
Refer to PROCEDURE - Step 7
- INSTALL FRONT AXLE SHAFT NUT RH
HINT:
Remove the RH side following the same procedure as for the LH side.
- CONNECT FRONT SPEED SENSOR LH
Refer to PROCEDURE - Step 14
- CONNECT FRONT SPEED SENSOR RH
HINT:
Remove the RH side following the same procedure as for the LH side.
- CONNECT NO. 2 STEERING INTERMEDIATE SHAFT ASSEMBLY
Refer to PROCEDURE - Step 4
- INSTALL PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY
Refer to PROCEDURE - Step 1
- INSPECT AND ADJUST NO. 2 AND NO. 3 JOINT ANGLE
Refer to PROCEDURE - Step 3
- INSTALL NO. 2 FUEL TANK PROTECTOR
Refer to PROCEDURE - Step 4
- INSTALL NO. 1 CENTER FLOOR HEAT INSULATOR SUB-ASSEMBLY
Refer to PROCEDURE - Step 5
- INSTALL FRONT EXHAUST PIPE ASSEMBLY
Refer to PROCEDURE - Step 3
- INSTALL FRONT CENTER FLOOR BRACE SUB-ASSEMBLY
Refer to PROCEDURE - Step 4
- INSTALL FLOOR BOARD SUB-ASSEMBLY
Refer to PROCEDURE - Step 5
- INSTALL NO. 2 FLOOR BOARD SUB-ASSEMBLY
Refer to PROCEDURE - Step 6
- INSTALL REAR FLOOR SIDE MEMBER COVER LH
Refer to PROCEDURE - Step 8
- INSTALL REAR FLOOR SIDE MEMBER COVER RH
Refer to PROCEDURE - Step 7
- INSTALL REAR FRAME RAIL SUB-ASSEMBLY
- INSTALL NO. 2 FRONT BUMPER REINFORCEMENT SUB-ASSEMBLY
- INSTALL RADIATOR SUPPORT OPENING COVER
- Install the 4 screws, attach the 3 claws and install the radiator support opening cover to the front crossmember sub-assembly.
Torque: 5.5 N.m (56 kgf/cm, 49 in.lbf)
- Install the 4 screws, attach the 3 claws and install the radiator support opening cover to the front crossmember sub-assembly.
- INSTALL RADIATOR SUPPORT EXTENSION RH
- Install the 3 screws, attach the 2 claws and install the radiator support extension RH to the radiator support opening cover.
Torque: 5.5 N.m (56 kgf/cm, 49 in.lbf)
- Return the front fender liner RH to its original position.
- Install the 3 screws, attach the 2 claws and install the radiator support extension RH to the radiator support opening cover.
- INSTALL RADIATOR SUPPORT EXTENSION LH
- Install the 3 screws, attach the 2 claws and install the radiator support extension LH to the radiator support opening cover.
Torque: 5.5 N.m (56 kgf/cm, 49 in.lbf)
- Return the front fender liner LH to its original position.
- Install the 3 screws, attach the 2 claws and install the radiator support extension LH to the radiator support opening cover.
- INSTALL FRONT BUMPER COVER
- except Sport Package:
Refer to INSTALLATION [10/2023 - ]
- except Sport Package:
- CONNECT NO. 2 FUEL TUBE SUB-ASSEMBLY
- Connect the No. 2 fuel tube sub-assembly and clamp.
Refer to PRECAUTION [10/2020 - ]
- Connect the No. 2 fuel tube sub-assembly and clamp.
- CONNECT FUEL TUBE SUB-ASSEMBLY
- Connect the fuel tube sub-assembly and clamp.
Refer to PRECAUTION [10/2020 - ]
- Connect the fuel tube sub-assembly and clamp.
- CONNECT NO. 3 ENGINE WIRE
- CONNECT NO. 3 ENGINE ROOM WIRE
- Connect the No. 3 engine room wire with the 2 bolts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
*A w/o Advanced Park *B w/ Advanced Park - Attach the claw and connect the connector holder.
- Connect the connector of the air conditioning wire.
- w/ Advanced Park:
Connect the No. 3 engine room wire with the 4 connectors.
- w/o Advanced Park:
Connect the No. 3 engine room wire with the 2 connectors.
- Connect the No. 3 engine room wire with the 2 bolts.
- CONNECT ENGINE WIRE
- INSTALL ECM
Refer to PROCEDURE - Step 3
- INSTALL NO. 2 RELAY BLOCK COVER
- CONNECT SUCTION HOSE SUB-ASSEMBLY A
Refer to PROCEDURE - Step 6
- CONNECT DISCHARGE HOSE SUB-ASSEMBLY
Refer to PROCEDURE - Step 5
- CONNECT TRANSMISSION OIL COOLER HOSE
Refer to PROCEDURE - Step 31
- CONNECT NO. 2 OIL COOLER OUTLET HOSE
Refer to PROCEDURE - Step 32
- CONNECT WATER HOSE SUB-ASSEMBLY
Refer to PROCEDURE - Step 2
- CONNECT INLET HEATER WATER HOSE
- CONNECT OUTLET HEATER WATER HOSE
- CONNECT NO. 3 RADIATOR HOSE
Refer to PROCEDURE - Step 28
- CONNECT NO. 1 RADIATOR HOSE
Refer to PROCEDURE - Step 29
- CONNECT NO. 1 FUEL VAPOR FEED HOSE
- CONNECT GENERATOR CABLE
Refer to PROCEDURE - Step 13
- CONNECT MOTOR CABLE
Refer to PROCEDURE - Step 12
- INSTALL INVERTER TERMINAL COVER
Refer to PROCEDURE - Step 14
- INSTALL AIR CLEANER WITH AIR CLEANER HOSE
Refer to PROCEDURE - Step 4
- CONNECT NO. 2 PCV HOSE
Refer to PROCEDURE - Step 6
- INSTALL NO. 1 AIR CLEANER INLET
Refer to PROCEDURE - Step 5
- INSTALL RADIATOR SUPPORT TO CROSSMEMBER BRACE SUB-ASSEMBLY LH
Refer to PROCEDURE - Step 30
- INSTALL RADIATOR SUPPORT TO CROSSMEMBER BRACE SUB-ASSEMBLY RH
Refer to PROCEDURE - Step 29
- ADD ENGINE OIL
Refer to PROCEDURE - Step 8
- ADD DIFFERENTIAL OIL
Refer to PROCEDURE - Step 3
- ADD HYBRID TRANSMISSION FLUID
Refer to PROCEDURE - Step 3
- INSTALL SERVICE PLUG GRIP
Refer to INSTALLATION [10/2020 - ]
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Refer to INSTALLATION [10/2023 - ]
- INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
Refer to WORK PROCEDURE [10/2022 - ]
HINT:
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.
- INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY
Refer to PROCEDURE - Step 13
- PARKING LOCK FORCED RELEASE
Refer to PROCEDURE - Step 2
- CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT
Refer to PROCEDURE - Step 5
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 8
- ADD COOLANT (for Inverter)
Refer to PROCEDURE - Step 7
- WARM UP COMPRESSOR
Refer to PROCEDURE - Step 6
- INSPECT SHIFT LEVER POSITION
Refer to PROCEDURE - Step 5
- ADJUST TRANSMISSION FLUID
Refer to PROCEDURE - Step 4
- INSPECT FOR ENGINE COOLANT LEAK
Refer to PROCEDURE - Step 3
- INSPECT FOR COOLANT LEAK (for Inverter)
Refer to PROCEDURE - Step 1
- INSPECT FOR OIL LEAK
Refer to PROCEDURE - Step 10
- INSPECT FOR FUEL LEAK
Refer to PROCEDURE - Step 1
- INSPECT FOR EXHAUST GAS LEAK
Refer to PROCEDURE - Step 9
- INSPECT FOR REFRIGERANT LEAK
Refer to PROCEDURE - Step 7
- INSTALL FRONT WHEEL
Refer to INSTALLATION [10/2017 - ]
- STABILIZE SUSPENSION
Refer to PROCEDURE - Step 10
- PLACE FRONT WHEELS FACING STRAIGHT AHEAD
- CHECK AND ADJUST FRONT WHEEL ALIGNMENT
Refer to ADJUSTMENT [10/2023 - ]
- INSPECT THROTTLE WITH MOTOR BODY ASSEMBLY
Refer to PROCEDURE - Step 1
- INSPECT IGNITION TIMING
Refer to PROCEDURE - Step 8
- INSPECT ENGINE IDLE SPEED
Refer to PROCEDURE - Step 9
- INSPECT CO/HC
Refer to PROCEDURE - Step 11
- INSPECT ENGINE OIL LEVEL
Refer to PROCEDURE - Step 2
- INSTALL STRUT BAR BRACKET SUPPORT SUB-ASSEMBLY
- INSTALL FRONT SUSPENSION MEMBER BRACE
- INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY
- INSTALL TRANSMISSION UNDER COVER
- INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
- INSTALL LOWER RADIATOR AIR DEFLECTOR
Refer to PROCEDURE - Step 31
- INSTALL UPPER RADIATOR SUPPORT SEAL
Refer to PROCEDURE - Step 32
- INSTALL RADIATOR COVER PLATE
Refer to PROCEDURE - Step 33
- INSTALL V-BANK COVER SUB-ASSEMBLY
- INSTALL INVERTER COVER ASSEMBLY RH
Refer to PROCEDURE - Step 17