Installing cylinder bank 2 exhaust camshaft
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2023 BMW M5, 2022 BMW M5, 2021 BMW M5, 2020 BMW M5, and 2019 BMW M5. However, it is still accessible from the selected car via links, so may be relevant.
- Plastic rings (1) are maintenance free and do not need to be replaced.
- Check plastic rings for damage, replace if necessary.
- Position exhaust camshaft.
- Position exhaust camshaft guide bearing shell.
- Screw in guide bearing screws in the order (1) to (10) by a half turn at a time until they can no longer be tightened.
- Tighten screws in the order (1) to (10) .
TIGHTENING TORQUE SPECIFICATIONS
| Intake/exhaust camshaft | ||
|---|---|---|
| M6 | Tightening torque | 10 Nm |
- Install roller tappet (1) into the high pressure pump bracket (2) .
Follow-up work
- Refer to INSTALLING BOTH LEFT VANOS ADJUSTERS (CYLINDER HEAD INSTALLATION CYLINDER BANK 2) .
- Refer to INSTALLING THE LEFT CYLINDER HEAD COVER .
- Refer to INSTALLING FUEL DELIVERY LINE .
- Installing holder with the wiring harness for the sensor system of cylinder bank 2.
- Refer to INSTALLING THE HOLDER WITH THE VEHICLE WIRING HARNESS FOR THE SENSOR SYSTEM OF CYLINDER BANK 1 .
- Refer to INSTALLING THE LEFT THROTTLE BODY .
- Refer to INSTALLING THE INTAKE PIPE .
- Refer to INSTALLING THE LEFT-HAND CHARGE AIR COOLER .
- Refer to INSTALLING THE RIGHT-HAND CHARGE AIR COOLER .
- Refer to INSTALLING OIL FILLER NECK .
- Refer to CLOSING THE COOLANT PUMPS .
- Refer to FILLING THE LOW-TEMPERATURE COOLING SYSTEM WITH THE VACUUM FILLING EQUIPMENT .
- Refer to VENTING THE LOW-TEMPERATURE COOLING SYSTEM .
- Refer to INSTALLING THE WHEEL ARCH COVER ON THE FRONT LEFT AND BOTTOM RIGHT .
- Refer to INSTALLING THE STIFFENING PLATE .
- Refer to INSTALLING COOLANT PUMPS .
- Refer to INSTALLING THE BELT PULLEY ON THE TORSIONAL VIBRATION DAMPER .
- Refer to INSTALLING THE BELT TENSIONER .
- Refer to INSTALLING DRIVE BELT .
- Refer to INSTALLING FAN COWL WITH ELECTRIC MOTOR .
- Refer to INSTALLING THE REAR TOP CROSS CONNECTION .
- Refer to INSTALLING THE CLEAN AIR PIPE OF CYLINDER BANK 2 .
- Refer to INSTALLING RIGHT INTAKE SILENCER HOUSING .
- Refer to INSTALLING LEFT INTAKE SILENCER HOUSING .
- Refer to INSTALLING FRONT CROSS CONNECTION .
- Refer to TIGHTENING THE LEFT FRONT-END STRUT .
- Refer to TIGHTENING THE FRONT-END STRUT ON THE RIGHT .
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT ON THE RIGHT .
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT ON THE LEFT .
- Refer to INSTALLING UPPER CATALYTIC CONVERTER NEAR ENGINE FOR BANK 2 .
- Refer to INSTALLING HEAT SHIELD, TOP .
- Installing conduit on bank 2.
- Clip the wiring harness (2) into the clamps (1).
- Refer to INSTALLING ENGINE VENTILATION LINE OF CYLINDER BANK 1 .
- Refer to INSTALLING THE TANK VENTILATION LINE OF CYLINDER BANK 1 PARTIALLY .
- Installing cable duct at cylinder bank 1.
- Position the conduit (2).
- Tighten the screws (1).
TIGHTENING TORQUESCable duct M6x16 screw Tightening torque 10Nm - Refer to INSTALLING THE ENGINE VENTILATION LINE OF CYLINDER BANK 2 .
- Refer to INSTALLING THE OXYGEN SENSOR MONITOR OF CYLINDER BANK 2 .
- Refer to CHECKING THE POSITION OF THE HEAT SHIELD .
- Refer to INSTALLING THE EXPANSION TANK FOR THE CHARGE AIR COOLER .
- Refer to INSTALLING COOLANT EXPANSION TANK .
- Refer to INSTALLING THE LAMBDA OXYGEN SENSOR FOR THE CYLINDERS 5 TO 8 .
- Refer to INSTALLING THE LAMBDA OXYGEN SENSOR FOR THE CYLINDERS 1 TO 4 .
- Refer to INSTALLING THE LEFT HIGH PRESSURE PUMP .
- Refer to INSTALLING THE HOLDER WITH THE VEHICLE WIRING HARNESS FOR THE SENSOR SYSTEM OF CYLINDER BANK 1 .
- Refer to INSTALLING THE CENTER COWL UPPER PART .
- Refer to INSTALLING TENSION STRUT ON SHOCK TOWER .
- Refer to INSTALLING WINDSHIELD PANEL COVER .
- Refer to INSTALLING LEFT AND RIGHT WIPER ARM .
- Removing the cover of the rear right engine compartment.
- Loosen the lock (1).
- Remove the cover (2).
Covering the vehicle battery
CAUTION: Unprotected battery terminals.Risk of short circuits! Risk of fire!
- Cover the vehicle battery
NOTE: The following step(s) must be performed if the listed component(s) is/are installed.- Cover the vehicle battery with the special tool 2 452 007 as shown.
- Refer to INSTALLING THE COVER OF THE ENGINE COMPARTMENT ON THE REAR LEFT .
- Refer to INSTALLING INJECTORS .
- Refer to CONNECTING THE CONNECTOR OF THE INJECTORS OF CYLINDER BANK 2 .
- Refer to INSTALLING RAIL OF CYLINDER BANK 1 .
- Refer to INSTALLING IGNITION COILS OF CYLINDER BANK 1 .
- Refer to INSTALLING CONTROL UNIT HOLDER FOR CYLINDERS 1 TO 4 .
- Installing the cover panel of the master DME control unit.
- Position the cover of the master DME control unit (1)
- Engage the cover panel of the master DME control unit (1) downwards with the clamps (2) and the guide pins (3) in the carrier plate of the DME.
- Refer to INSTALLING THE COVER PANEL OF THE SLAVE DME CONTROL UNIT .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to CONNECTING BATTERY GROUND LEAD .
- Refer to EVACUATE AND CHARGE CONDITIONING .