Install rail of cylinder bank 1
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2023 BMW M5, 2022 BMW M5, 2021 BMW M5, 2020 BMW M5, and 2019 BMW M5. However, it is still accessible from the selected car via links, so may be relevant.
- Position high pressure rail.
- Fit bolts (1) to system by hand.
- Fit bolts (1) to system by hand.
- Tighten nut (2) on the high pressure pump with the special tool 0 491 277 (13 5 020) .
TIGHTENING TORQUES SPECIFICATION
| Fuel supply line/rail to high pressure pump | ||
| Nut | tightening torque | 30 Nm |
- Tighten nuts (1) on the injectors with the special tool 0 495 908 (37 1 150) .
TIGHTENING TORQUES SPECIFICATION
| High-pressure rail to injectors | ||
| Nuts | Tightening torque | 23 Nm |
- Tighten down screws (1).
TIGHTENING TORQUES SPECIFICATION
| Rail to cylinder head cover | ||
| M6x25 screw | Tightening torque | 10 Nm |
- Tighten down screws (1).
TIGHTENING TORQUES SPECIFICATION
| Hold-down device to cylinder head cover | ||
| screw | Tightening torque | 13 Nm |
- Position ground cable (2).
- Tighten nuts (1).
TIGHTENING TORQUES SPECIFICATION
| Ground cable to hold-down device | ||
| Nuts | Tightening torque | 5.5 Nm |
- Connect connectors (1) and lock.
Follow-up work
- Refer to INSTALLING IGNITION COILS OF CYLINDER BANK 1 .
- Refer to INSTALLING CONTROL UNIT HOLDER FOR CYLINDERS 1 TO 4 .
- Installing the cover panel of the master DME control unit.
- Position the cover of the master DME control unit (1)
- Engage the cover panel of the master DME control unit (1) downwards with the clamps (2) and the guide pins (3) in the carrier plate of the DME.
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to CONNECTING BATTERY GROUND LEAD .