LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2009 >> Highlander Limited, FWD >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine Mechanical (2GR-FE) >> Engine Assembly >> Installation

Engine Assembly: Installation

  1. INSTALL TRANSVERSE ENGINE MOUNTING INSULATOR 
    1. Install the transverse engine mounting insulator with the 2 nuts.

      Torque: 52 N*m (525 kgf*cm, 38 ft.*lbf) 

      Fig 1: Locating Transverse Engine Mounting Insulator And Nuts
      G05640494Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the 2 hole plugs.
      Fig 2: Locating Hole Plugs
      G05640493Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL ENGINE HANGERS 
    1. Install the 2 engine hangers with the 4 bolts as shown in the illustration.

      Part No.: 

      No. 1 Engine hanger 12281-31120 

      No. 2 Engine hanger 12282-31100 

      Bolts 91671-10825 

      Torque: 33 N*m (337 kgf*cm, 24 ft.*lbf) 

    2. Attach the engine sling device and hang the engine with the chain block.
      Fig 3: Locating Engine Hangers With Bolts
      G04996618Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. REMOVE ENGINE STAND 
  4. INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY  (See INSTALLATION  )
  5. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY (for 2WD)  (See INSTALLATION )
  6. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY (for 4WD)  (See INSTALLATION )
  7. INSTALL TRANSFER STIFFENER PLATE RH (for 4WD)  (See INSTALLATION )
  8. INSTALL FRONT DRIVE SHAFT ASSEMBLY LH  (See INSTALLATION )
  9. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH (for 2WD)  (See INSTALLATION )
  10. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH (for 4WD)  (See INSTALLATION )
  11. INSTALL TRANSVERSE ENGINE MOUNTING BRACKET 
    1. Install the transverse engine mount bracket with the 3 bolts.

      Torque: 64 N*m (650 kgf*cm, 47 ft.*lbf) 

      Fig 4: Locating Transverse Engine Mounting Bracket Bolt
      G06112625Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  12. INSTALL FRONT ENGINE MOUNTING INSULATOR ASSEMBLY 
    1. Temporarily install the front engine mounting insulator assembly with the nut.
      Fig 5: Locating Front Engine Mounting Insulator Assembly And Nut
      G06112633Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  13. INSTALL TRANSVERSE ENGINE MOUNTING INSULATOR 
    1. Temporarily install the transverse engine mounting insulator with the nut.
      Fig 6: Locating Transverse Engine Mounting Insulator And Nut
      G06112634Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  14. INSTALL TRANSVERSE ENGINE MOUNTING INSULATOR 
    1. Temporarily install the transverse mounting insulator with the nut.
      Fig 7: Locating Transverse Engine Mounting Insulator And Nut
      G06112635Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  15. INSTALL FRONT FRAME ASSEMBLY 
    1. Temporarily install the engine assembly with transaxle with the 9 nuts and 2 bolts.
      Fig 8: Locating Engine Assembly, Transaxle Nuts And Bolts
      G06112650Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Tighten the 4 nuts.

      Torque: A 

      87 N*m (887 kgf*cm, 64 ft.*lbf) 

      52 N*m (525 kgf*cm, 38 ft.*lbf) 

      Fig 9: Locating Transaxle Nuts
      G06112651Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Tighten the 4 nuts.

      Torque: A 

      95 N*m (969 kgf*cm, 70 ft.*lbf) 

      87 N*m (887 kgf*cm, 64 ft.*lbf) 

      Fig 10: Locating Transaxle Nuts
      G06112652Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Tighten the 4 nuts.

      Torque: A 

      95 N*m (969 kgf*cm, 70 ft.*lbf) 

      87 N*m (887 kgf*cm, 64 ft.*lbf) 

      Fig 11: Locating Transaxle Nuts
      G06112653Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    5. Tighten the 2 bolts.

      Torque: 78 N*m (795 kgf*cm, 58 ft.*lbf) 

      Fig 12: Locating Transaxle Bolts
      G06030583Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    6. Connect the duty vacuum switching valve connector and clamp.
      Fig 13: Locating Duty Vacuum Switching Valve Connector And Clamp
      G06112628Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    7. Install the 5 hole plugs.
      Fig 14: Locating Hole Plugs
      G05640491Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  16. INSTALL POWER STEERING LINK ASSEMBLY (for 4WD)  (See INSTALLATION )
  17. INSTALL FRONT STABILIZER BAR 

    HINT:

    (See INSTALLATION ).

  18. REMOVE ENGINE HANGERS 
    1. Remove the 4 bolts and 2 engine hangers.
      Fig 15: Locating Engine Hangers With Bolts
      G04996618Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  19. INSTALL MANIFOLD STAY 
    1. Install the bolt, nut and manifold stay.

      Torque: 34 N*m (347 kgf*cm, 25 ft.*lbf) 

  20. INSTALL STARTER ASSEMBLY  (See INSTALLATION )
    Fig 16: Removing Bolt, Nut, And Manifold Stay
    G05136510Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  21. INSTALL ENGINE WIRE 
    1. Install the 3 bolts.
      Fig 17: Locating Engine Wire Bolts
      G06112624Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 8.3 N*m (85 kgf*cm, 74 in.*lbf) 

    2. Connect the 2 clamps, 3 ignition coil assembly connectors, 2 camshaft timing oil control valve assembly connectors, 2 VVT sensor connectors, 3 injector assembly connectors and radio setting condenser connector.
    3. Install the bolt and 2 nuts.
      Fig 18: Locating Air Fuel Ratio Sensor Connector And Clamp
      G06112623Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 8.3 N*m (85 kgf*cm, 74 in.*lbf) 

    4. Connect the 2 clamps, 3 ignition coil assembly connectors, 2 camshaft timing oil control valve assembly connectors, 2 VVT sensor connectors and 3 injector connectors.
    5. Connect the air fuel ratio sensor connector.
    6. Connect the 2 clamps, engine coolant temperature sensor connector and knock control sensor wire connector.
    7. Install the ground cable bolt.
      Fig 19: Locating Engine Coolant Temperature Sensor Connector And Bolt
      G06112622Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    8. Connect the purge VSV connector, air fuel ratio sensor connector and 2 clamps.
      Fig 20: Locating Purge VSV Connector, Air Fuel Ratio Sensor Connector And Clamps
      G06112621Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    9. Install the nut.

      Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf) 

    10. Connect the generator assembly connector and clamp.
      Fig 21: Locating Generator Assembly Connector And Clamp
      G06112620Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    11. Connect the crankshaft position sensor connector and clamp.
      Fig 22: Locating Crankshaft Position Sensor Connector And Clamp
      G06112619Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    12. Connect the oil pressure switch assembly connector.
      Fig 23: Locating Oil Pressure Switch Assembly Connector
      G06112618Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    13. Connect the oil pressure switch assembly cover.
  22. INSTALL INTAKE AIR SURGE TANK ASSEMBLY 
    NOTE: Do not apply oil to the bolts as listed below:
    BOLT SPECIFICATION

    Oil Application Prohibited Bolt
    Bolt for surge tank and intake manifold
    Bolt for surge tank stay No. 1 and surge tank
    Bolt for surge tank stay No. 1 and cylinder head cover
    Bolt for throttle body bracket and surge tank
    Bolt for throttle body bracket and cylinder head cover
    Fig 24: Identifying Oil Pressure Switch Cover And Clamp
    G06112617Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. Install a new gasket to the intake air surge tank.
    2. Using a 5 mm hexagon socket wrench, install the 4 bolts and 2 nuts.

      Torque: Bolt 

      18 N*m (184 kgf*cm, 13 ft.*lbf) 

      Nut 

      16 N*m (163 kgf*cm, 12 ft.*lbf) 

    3. Install the throttle body bracket, No. 1 surge tank stay and 4 bolts.

      Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf) 

      Fig 25: Installing Throttle Body Bracket, No. 1 Surge Tank Stay And Bolts
      G04974519Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Connect the connector.
    5. Connect the No. 1 ventilation hose.
      Fig 26: Identifying No. 1 Ventilation Hose
      G04974478Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    6. Install the clamp and connect the throttle with motor body assembly connector.
    7. Connect the vapor feed hose.
    8. Connect the 2 water by-pass hoses to the throttle with motor body assembly.
      Fig 27: Connecting Water By-Pass Hoses To Throttle With Motor Body Assembly
      G04974522Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  23. INSTALL VENTILATION HOSE 
    1. Using pliers, grip the claws of the 2 clips and slide the 2 clips to the intake air surge tank assembly and ventilation valve.
  24. TEMPORARILY TIGHTEN COMPRESSOR AND MAGNETIC CLUTCH  (See INSTALLATION )
    Fig 28: Removing Ventilation Hose
    G05136512Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  25. INSTALL COMPRESSOR AND MAGNETIC CLUTCH 
    1. Install the compressor and magnetic clutch with the 4 bolts.

      Torque: 25 N*m (255 kgf*cm, 18 ft.*lbf) 

      NOTE: Tighten the bolts in the order shown in the illustration to install the compressor and magnetic clutch.
      Fig 29: Locating Magnetic Clutch And Bolts
      G05418841Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Engage each clamp.
    3. Engage the clamp.
    4. Connect the connector.
  26. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE 
    1. Set the engine assembly with transaxle on the engine lifter.
    2. Install the engine assembly to the vehicle.
      Fig 30: Identifying Compressor Clamp
      G06112611Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the frame side rail plates RH and LH with the 6 bolts and 2 nuts.

      Torque: A 

      85 N*m (867 kgf*cm, 63 ft.*lbf) 

      32 N*m (327 kgf*cm, 24 ft.*lbf) 

      Fig 31: Locating Frame Side Rail Plates, Bolts And Nuts
      G06112673Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Install the front suspension member rear braces RH and LH with the 6 bolts and 2 nuts.

      Torque: A 

      85 N*m (867 kgf*cm, 63 ft.*lbf) 

      32 N*m (327 kgf*cm, 24 ft.*lbf) 

  27. RECONNECT SUCTION HOSE SUB-ASSEMBLY  (See INSTALLATION )
    Fig 32: Locating Front Suspension Member Rear Braces, Bolt And Nut
    G06112674Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  28. RECONNECT DISCHARGE HOSE SUB-ASSEMBLY  (See INSTALLATION )
  29. INSTALL STEERING INTERMEDIATE SHAFT SUB-ASSEMBLY  (See INSTALLATION )
  30. INSTALL FRONT AXLE ASSEMBLY LH  (See INSTALLATION )
  31. INSTALL FRONT AXLE ASSEMBLY RH 

    HINT:

    Use the same procedure described for the LH side.

  32. INSTALL NO. 1 FRONT SUSPENSION LOWER ARM LH  (See INSTALLATION )
  33. INSTALL NO. 1 FRONT SUSPENSION LOWER ARM RH 

    HINT:

    Use the same procedure described for the LH side.

  34. INSTALL TIE ROD ASSEMBLY LH  (See INSTALLATION )
  35. INSTALL TIE ROD ASSEMBLY RH 

    HINT:

    Use the same procedure described for the LH side.

  36. INSTALL FRONT SPEED SENSOR LH  (See INSTALLATION )
  37. INSTALL FRONT SPEED SENSOR RH 

    HINT:

    Use the same procedure described for the LH side.

  38. INSTALL FRONT AXLE HUB NUT LH  (See INSTALLATION )
  39. INSTALL FRONT AXLE HUB NUT RH 

    HINT:

    Use the same procedure described for the LH side.

  40. INSTALL FRONT STABILIZER LINK ASSEMBLY LH  (See INSTALLATION )
  41. INSTALL FRONT STABILIZER LINK ASSEMBLY RH 

    HINT:

    Use the same procedure described for the LH side.

  42. INSTALL FRONT EXHAUST PIPE ASSEMBLY  (See INSTALLATION )
  43. INSTALL FRONT NO. 3 EXHAUST PIPE SUB-ASSEMBLY  (See INSTALLATION )
  44. INSTALL CENTER EXHAUST PIPE ASSEMBLY  (See INSTALLATION )
  45. INSTALL TAIL EXHAUST PIPE ASSEMBLY  (See INSTALLATION )
  46. TEMPORARILY TIGHTEN PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY  (See INSTALLATION )
  47. FULLY TIGHTEN PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY  (See INSTALLATION )
  48. CONNECT ENGINE WIRE 
    1. Connect the 3 ECM connectors, 2 junction block connectors and clamp.
      Fig 33: Identifying Junction Block Connectors And Clamp
      G06112605Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the engine wire with the 2 nuts.

      Torque: 8.3 N*m (84 kgf*cm, 73 in.*lbf) 

      Fig 34: Identifying Engine Wire, Clamp And Nuts
      G06112606Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the clip and 2 ground cables with the 2 bolts.

      Torque: 8.3 N*m (84 kgf*cm, 73 in.*lbf) 

      Fig 35: Locating Ground Cables, Clip And Bolts
      G06112604Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Connect the heated oxygen sensor clamp and connector.
      Fig 36: Locating Heated Oxygen Sensor Connector And Clamp
      G06112603Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    5. Connect the engine wire clamp.
      Fig 37: Identifying Engine Wire Clamp
      G06112601Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    6. Install the ground cable with the bolt.

      Torque: 8.3 N*m (84 kgf*cm, 73 in.*lbf) 

      Fig 38: Locating Ground Cables Bolt
      G06112602Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    7. Connect the engine wire to the engine room relay block. Then, install it with the nut.

      Torque: 8.3 N*m (84 kgf*cm, 73 in.*lbf) 

    8. Connect the engine wire connector.
    9. Install the No. 1 relay block cover.
      Fig 39: Locating Engine Room Relay Block
      G06112127Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  49. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY 
    1. Connect the control cable to the control cable clamp.
      Fig 40: Identifying Control Cable And Control Cable Clamp
      G04975975Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the transmission control cable assembly to the control shaft lever with the nut.

      Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf) 

      Fig 41: Locating Control Shaft Lever
      G06112597Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Connect the transmission control cable assembly to the bracket with a new clip.
      Fig 42: Identifying Control Cable Bracket
      G06112598Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  50. CONNECT FUEL TUBE SUB-ASSEMBLY 
    1. Push in the fuel tube connector to the fuel pipe until the fuel tube makes a "click" sound.
      NOTE:
      • Check for damage or dirt and foreign objects on the connected part of the pipe.
      • Check if the pipe and the connector are securely connected by trying to pull them apart.
        Fig 43: Pushing Fuel Tube Connector To Fuel Pipe
        G04961676Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the No. 1 fuel pipe clamp.
      Fig 44: Identifying No. 1 Fuel Pipe Clamp
      G06112593Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  51. CONNECT OIL COOLER OUTLET HOSE 
    1. Using pliers, grip the claws of the clip and slide the clip to connect the oil cooler outlet hose.
      Fig 45: Locating Oil Cooler Outlet Hose And Claws
      G06112596Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  52. CONNECT OIL COOLER INLET HOSE 
    1. Using pliers, grip the claws of the clip and slide the clip to connect the No. 2 oil cooler hose.
      Fig 46: Locating No. 2 Oil Cooler Hose And Claws
      G06112595Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  53. CONNECT HEATER WATER HOSE INLET B 
    1. Using pliers, grip the claws of the clip and slide the clip to connect the heater water inlet hose B to water outlet.
      Fig 47: Locating Heater Water Inlet Hose Clip
      G06112592Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  54. CONNECT HEATER WATER HOSE OUTLET B 
    1. Using pliers, grip the claws of the clip and slide the clip to connect the heater water outlet hose B to water inlet.
      Fig 48: Locating Heater Water Outlet Hose And Claws
      G06112591Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  55. INSTALL NO. 1 RADIATOR HOSE 
    1. Using pliers, grip the claws of the clip and slide the clip to connect the No. 1 radiator hose to the water outlet.
    2. Install the clamp with the air fuel ratio sensor connector.
      Fig 49: Locating No. 1 Radiator Hose And Clamp
      G06112589Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  56. INSTALL NO. 2 RADIATOR HOSE 
    1. Using pliers, grip the claws of the clip and slide the clip to connect the No. 2 radiator outlet hose to the water inlet.
      Fig 50: Locating No. 2 Radiator Hose And Clip
      G06112590Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  57. CONNECT UNION TO CHECK VALVE HOSE 
    1. Using pliers, grip the claws of the clip and slide the clip to connect the union to check valve hose to the intake air surge tank assembly.
      Fig 51: Locating Front Exhaust Pipe Clip
      G05136500Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  58. CONNECT NO. 1 FUEL VAPOR FEED HOSE 
    1. Install the clamp and connect the No. 1 fuel vapor feed hose.
      Fig 52: Locating No. 1 Fuel Vapor Feed Hose And Clamp
      G06112588Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  59. INSTALL ENGINE MOVING CONTROL ROD 
    1. Temporarily install the engine moving control rod with the 3 bolts.
    2. First install bolts A, and then bolt B.

      Torque: 38 N*m (388 kgf*cm, 28 ft.*lbf) 

      Fig 53: Locating Engine Moving Control Rod And Bolts
      G06112695Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  60. INSTALL NO. 2 ENGINE MOUNTING STAY RH 
    1. Temporarily install the No. 2 engine mounting stay RH with the bolt.

      Torque: 38 N*m (388 kgf*cm, 28 ft.*lbf) 

    2. Tighten the 2 nuts.

      Torque: 23 N*m (235 kgf*cm, 17 ft.*lbf) 

      Fig 54: Locating Nuts On No. 2 Engine Mounting Stay RH
      G05136481Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  61. INSTALL RESERVOIR BRACKET 
    1. Install the reservoir bracket with the 2 bolts.

      Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf) 

      Fig 55: Locating Reservoir Bracket And Bolt
      G06112118Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  62. INSTALL BRAKE MASTER CYLINDER RESERVOIR ASSEMBLY 
    1. Install the brake master cylinder reservoir assembly with the bolt.

      Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf) 

    2. Connect the level warning switch connector.
      Fig 56: Locating Brake Master Cylinder Reservoir Assembly And Bolt
      G06112117Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  63. INSTALL AIR CLEANER BRACKET 
    1. Install the 2 bolts and air cleaner bracket.

      Torque: 12 N*m (123 kgf*cm, 9 ft.*lbf) 

      Fig 57: Locating Air Cleaner Bracket And Bolt
      G06112583Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  64. INSTALL BATTERY 
    1. Install the battery tray and battery.
    2. Install the battery clamp with the bolt and nut.

      Torque: Bolt 

      5.4 N*m (55 kgf*cm, 48 in.*lbf) 

      Nut A 

      5.4 N*m (55 kgf*cm, 48 in.*lbf) 

      Nut B 

      13 N*m (131 kgf*cm, 9 ft.*lbf) 

      Nut C 

      6.4 N*m (64 kgf*cm, 57 in.*lbf) 

      Fig 58: Locating Battery Clamp Bolt And Nut
      G06112700Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the positive battery terminal and nut.
    4. Connect the negative battery terminal, and tighten the nut.
  65. INSTALL AIR CLEANER CASE SUB-ASSEMBLY  (See INSTALLATION )
  66. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY 
    1. Install the air cleaner filter element sub-assembly.
  67. INSTALL AIR CLEANER CAP SUB-ASSEMBLY  (See INSTALLATION )
  68. INSTALL NO. 1 AIR CLEANER INLET  (See INSTALLATION )
  69. INSTALL NO. 2 AIR CLEANER INLET  (See INSTALLATION )
  70. CONNECT VACUUM HOSES 
    Fig 59: Identifying Vacuum Hoses Components Location
    G06112701Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  71. INSTALL V-RIBBED BELT  (See INSTALLATION  )
  72. INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY 
    1. Install the front outer cowl top panel sub-assembly with the 8 bolts and 6 nuts.
      Fig 60: Identifying Front Outer Cowl Top Panel Sub-Assembly, Bolts And Nuts
      G06112702Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: Bolt 

      8.8 N*m (90 kgf*cm, 78 in.*lbf) 

      Nut A 

      8.8 N*m (90 kgf*cm, 78 in.*lbf) 

      Nut B 

      85 N*m (867 kgf*cm, 63 ft.*lbf) 

    2. Install the 4 clips.
  73. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY  (See INSTALLATION )
  74. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY 
  75. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH  (See INSTALLATION )
  76. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH  (See INSTALLATION )
    Fig 61: Identifying Engine Wire Clips
    G06112580Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  77. INSTALL FRONT WHEELS 

    Torque: 103 N*m (1050 kgf*cm, 76 ft.*lbf) 

  78. ADD ENGINE OIL  (See REPLACEMENT )
  79. ADD ENGINE COOLANT  (See REPLACEMENT )
  80. ADD AUTOMATIC TRANSAXLE FLUID 
  81. CHECK AUTOMATIC TRANSAXLE FLUID  (See AUTOMATIC TRANSAXLE FLUID )
  82. INSPECT FOR FUEL LEAK  (See ON-VEHICLE INSPECTION )
  83. INSPECT FOR ENGINE OIL LEAK  (See REPLACEMENT )
  84. INSPECT FOR COOLANT LEAK  (See COOLING SYSTEM )
  85. INSPECT FOR EXHAUST GAS LEAK  (See INSTALLATION )
  86. CHECK SHIFT LEVER POSITION  (See ON-VEHICLE INSPECTION )
  87. CHECK AND ADJUST FRONT WHEEL ALIGNMENT 

    HINT:

    (See FRONT WHEEL ALIGNMENT ).

  88. CHECK IGNITION TIMING  (See ON-VEHICLE INSPECTION  )
  89. CHECK ENGINE IDLE SPEED  (See ON-VEHICLE INSPECTION  )
  90. CHECK CO/HC  (See ON-VEHICLE INSPECTION  )
  91. CHECK FUNCTION OF THROTTLE BODY ASSEMBLY  (See ON-VEHICLE INSPECTION )
  92. INSTALL FRONT FENDER APRON SEAL RH 
    1. Install the front fender apron seal RH with the 2 bolts and clip.
      Fig 62: Locating Front Fender Apron Seal RH, Clip And Bolts
      G06112110Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  93. INSTALL FRONT FENDER APRON SEAL LH 
    1. Install the front fender apron seal LH with the 2 bolts and clip.
  94. INSTALL FRONT FENDER LINER LH  (See INSTALLATION )
  95. INSTALL FRONT FENDER LINER RH  (See INSTALLATION )
  96. INSTALL FRONT FENDER MOULDING SUB-ASSEMBLY LH  (See INSTALLATION )
    Fig 63: Locating Front Fender Apron Seal LH, Clip And Bolts
    G06112109Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  97. INSTALL FRONT FENDER MOULDING SUB-ASSEMBLY RH  (See INSTALLATION )
  98. INSTALL FLOOR UNDER COVER LH 
  99. INSTALL NO. 2 ENGINE UNDER COVER 
    1. Install the No. 2 engine under cover with the 2 bolts.
      Fig 64: Locating No. 2 Engine Under Cover And Bolts
      G06112577Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  100. INSTALL NO. 1 ENGINE UNDER COVER 
    1. Install the No. 1 engine under cover with the 6 bolts and 2 clips.
      Fig 65: Locating No. 1 Engine Under Cover, Bolt And Clips
      G06112576Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  101. INSTALL ENGINE UNDER COVER ASSEMBLY 
    1. Install the engine under cover assembly with the 4 bolts and 5 clips.
      Fig 66: Locating Engine Under Cover Assembly, Bolt And Screw
      G06112575Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the engine under cover assembly RR with the 2 bolts.
      Fig 67: Locating Engine Under Cover Assembly RR And Bolts
      G06112574Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  102. INSTALL V-BANK COVER SUB-ASSEMBLY 
    1. Fit the 3 retainers and install the V-bank cover.
  103. CHECK ABS SPEED SENSOR SIGNAL 

    TEST MODE PROCEDURE

  104. RESET MEMORY 

    HINT:

    See INITIALIZATION .

    Fig 68: Identifying Clip On Rear Of Cover
    G05136475Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002