Replacing rear timing case cover
Replacement: Remount crankshaft sensor
- For timing case cover replacements:
Remount crankshaft sensor.
NOTE:
RISK OF DAMAGE
Electrostatic discharge.
Damage to or destruction of electrical components.
Electrostatic discharge.
Damage to or destruction of electrical components.
- Leave the electrical components in their original packaging until they are being installed. Only use the original packaging for returning the product. Always package removed components straight away.
- Read and comply with user information on using the associated special tool 12 7 060.
- Only tap the housings of electrical components. Do not tap pins or multi-pin connectors directly.
- Wear electrically conductive clothing and antistatic shoes (with ESD symbol).
- For additional information see: NOTES ON ESD PROTECTION (ELECTRO STATIC DISCHARGE) .
- Loosen the screw (1) and remount the crankshaft sensor (2) .
- Tighten down screw (1)
.TIGHTENING TORQUES SPECIFICATION
Crankshaft sensor to timing case cover 4.6 Nm
NOTE:
RISK OF DAMAGE
Damage to the surface.
The use of metal-cutting tools (e.g., emery cloths) for cleaning surfaces can damage them and lead to leaks and/or engine damage.
Damage to the surface.
The use of metal-cutting tools (e.g., emery cloths) for cleaning surfaces can damage them and lead to leaks and/or engine damage.
- Do not use any metal-cutting tools.
- Remove the seal residue in areas (1)
using special tool 0 495 102 (11 4 470)
.
- Check the fitting sleeves (1) for damage and replace as needed.
- Check for correct fit of fitting sleeves (1)
.
NOTE:
TECHNICAL INFORMATION
The processing time of the liquid sealing compound can be at a maximum of 10 min.
Commissioning of the assembly is not possible until 25 minutes after the processing time.
Non-observance can lead to leaks in the assembly.
The processing time of the liquid sealing compound can be at a maximum of 10 min.
Commissioning of the assembly is not possible until 25 minutes after the processing time.
Non-observance can lead to leaks in the assembly.
- Apply the sealing compound in area (1)
along the inner edge.SEALING COMPOUND SPECIFICATION
Loctite 5970 liquid sealing compound
Processing time <10 minutes at room temperature50 ml, Cartridge 83190404517 TECHNICAL DATA SPECIFICATIONHeight of the sealing bead 2.0 mm... 2.5 mm - Mount special tool 0 496 137 (11 8 815)
and 0 496 132 (11 8 810)
on the crankshaft.
- Replace screws (1)
to (11)
.
Parts: Screws
- Carefully mount the new timing case cover (A) .
- Tighten the screws in order from (1)
to (11)
.TIGHTENING TORQUES SPECIFICATION
Rear timing case cover on crankcase M6 x 31
Replace screws.Joining torque 8 Nm Angle of rotation 90° - Connect and lock the connector (1) .
- Make sure the connector (1)
engages audibly.
Follow-up work
- Refer to INSTALLING THE OIL PAN .
- Refer to INSTALLING THE FLYWHEEL .
- Refer to INSTALLING THE ACOUSTIC COVER FOR THE OIL PAN .
- Refer to BLOCKING THE CRANKSHAFT IN THE TDC FIRING POSITION OF CYLINDER 1 .
- Refer to SEALING THE OIL DUCT .
- Refer to CLEANING SEALING SURFACES .
- Refer to REPLACING CYLINDER HEAD GASKET .
- Refer to INSTALLING THE CYLINDER HEAD .
- Refer to ADJUSTING THE CAMSHAFTS WITH THE SPECIAL TOOL .
- Refer to INSTALLING EXHAUST CAMSHAFT ADJUSTER .
- Refer to INSTALLING THE INTAKE ADJUSTER .
- Refer to INSTALLING THE VANOS CENTRAL VALVE OF THE INTAKE ADJUSTER .
- Refer to INSTALLING THE VANOS CENTRAL VALVE OF THE EXHAUST CAMSHAFT ADJUSTER .
- Refer to PRE-TENSIONING THE TIMING CHAIN WITH THE SPECIAL TOOL .
- Refer to TIGHTENING THE VANOS CENTRAL VALVE OF THE EXHAUST CAMSHAFT ADJUSTER .
- Refer to TIGHTENING THE VANOS CENTRAL VALVE OF THE INTAKE ADJUSTER .
- Refer to DISASSEMBLING ALL SPECIAL TOOLS .
- Refer to INSTALLING CHAIN TENSIONER .
- Refer to CHECKING THE TIMINGS OF THE CAMSHAFT .
- Refer to INSTALLING THE OIL RETURN LINE FOR THE EXHAUST TURBOCHARGER .
- Refer to INSTALLING THE COOLANT RETURNING LINE FOR THE EXHAUST TURBOCHARGER .
- Refer to INSTALLING THE COOLANT FEED LINE FOR THE EXHAUST TURBOCHARGER .
- Refer to INSTALLING CYLINDER HEAD COVER .
- Refer to INSTALLING BOTH ACTUATORS .
- Refer to INSTALLING THE HEAT SHIELD ON THE CYLINDER HEAD .
- Refer to PREPARING THE INJECTORS FOR INSTALLATION .
- Refer to INSTALLING THE RAIL WITH INJECTORS .
- Refer to INSTALLING HIGH PRESSURE PUMP .
- Refer to INSTALLING THE HIGH-PRESSURE LINE BETWEEN THE HIGH-PRESSURE PUMP AND THE HIGH-PRESSURE RAIL .
- Refer to INSTALLING ALL SPARK PLUGS .
- Refer to INSTALLING THE INTAKE PLENUM .
- Refer to INSTALLING THE TANK VENT VALVE .
- Refer to TOPPING UP THE MOTOR OIL .
- Refer to REMOVING THE ENGINE FROM ASSEMBLY JIG .
- Refer to INSTALLING ENGINE .