LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2021 >> C-HR XLE >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine Mechanical - Service Information (1 Of 2) >> Engine Assembly & Engine Under Cover >> Installation [02/2017 - 10/2017] >> Procedure

Installation [02/2017 - 10/2017]: Procedure

  1. INSTALL ENGINE HANGER 

    See step  42

  2. REMOVE ENGINE FROM ENGINE STAND 
    1. Remove the engine assembly from the engine stand.
  3. INSTALL COMPRESSOR WITH PULLEY ASSEMBLY 

    Refer to PROCEDURE - Step 2

  4. INSTALL GENERATOR ASSEMBLY 

    Refer to PROCEDURE - Step 1

  5. INSTALL FAN AND GENERATOR V BELT 

    Refer to PROCEDURE - Step 1

  6. INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY 

    See step  2

  7. INSTALL ENGINE ASSEMBLY 

    Refer to PROCEDURE - Step 13

  8. INSTALL NO. 5 WATER BY-PASS HOSE 
    1. Install the No. 5 water by-pass hose to the No. 3 water by-pass pipe and oil cooler and slide the 2 clips to secure them.
    2. Engage the 2 clamps.
  9. INSTALL NO. 3 WATER BY-PASS HOSE 
    1. Install the No. 3 water by-pass hose to the cylinder head sub-assembly and oil cooler and slide the 2 clips to secure them.
    2. Engage the clamp.
  10. INSTALL ENGINE WIRE 
    1. Connect all the connectors and clamps, and install the engine wire to the engine assembly with transaxle.
  11. INSTALL FLYWHEEL HOUSING SIDE COVER 
    1. Install the flywheel housing side cover to the cylinder block sub-assembly.
  12. INSTALL STARTER ASSEMBLY 

    Refer to PROCEDURE - Step 1

  13. INSTALL ENGINE MOUNTING INSULATOR SUB-ASSEMBLY RH 

    HINT: 

    Perform this procedure only when replacement of the engine mounting insulator sub-assembly RH is necessary.

    1. Temporarily install the engine mounting insulator sub-assembly RH to the vehicle.
      Fig 1: Engine Mounting Insulator Sub-Assembly RH Tightening Sequence
      GTY764263Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Temporarily Tighten
    2. Install the 2 bolts and nut in the order shown in the illustration.

      Torque: 72 N*m (734 kgf*cm, 53 ft.*lbf) 

    3. Connect the air conditioner tube and accessory assembly to the engine mounting insulator sub-assembly RH with the bolt and nut.

      Bolt 

      Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf) 

      Nut 

      Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf) 

    4. Install the No. 2 earth wire to the engine mounting insulator sub-assembly RH and vehicle with the 2 bolts.

      Torque: 10.5 N*m (107 kgf*cm, 8 ft.*lbf) 

  14. INSTALL ENGINE MOUNTING INSULATOR LH 

    HINT: 

    Perform this procedure only when replacement of the engine mounting insulator LH is necessary.

    1. Temporarily install the engine mounting insulator LH to the vehicle.
      Fig 2: Engine Mounting Insulator LH Tightening Sequence
      GTY760812Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Temporarily Tighten
    2. Install the 4 bolts and nut in the order shown in the illustration.

      Torque: 42 N*m (428 kgf*cm, 31 ft.*lbf) 

  15. REMOVE ENGINE HANGER 

    See step  56

  16. INSTALL WIRE HARNESS CLAMP BRACKET 
    1. Install the wire harness clamp bracket with the bolt.

      Torque: 39 N*m (398 kgf*cm, 29 ft.*lbf) 

    2. Connect the air fuel ratio sensor connector.
    3. Engage the 5 clamps.
  17. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE 
    1. Using height adjustment attachments and plate lift attachments to keep the engine assembly with transaxle and front suspension crossmember sub-assembly level, set an engine lifter underneath the engine assembly with transaxle and front suspension crossmember sub-assembly.
      NOTE:
      • Using height adjustment attachments and plate lift attachments, keep the engine assembly with transaxle horizontal.
      • Do not perform any procedures while the engine assembly is suspended because doing so may cause the engine assembly to drop, resulting in injury. However, the engine assembly needs to be suspended when it is installed to or removed from an engine stand.
      • To prevent the oil pan sub-assembly from deforming, do not place any attachments under the oil pan sub-assembly of the engine assembly with transaxle.
    2. Operate the engine lifter and install the engine assembly with transaxle to the vehicle.
      WARNING:

      Do not raise the engine assembly with transaxle more than necessary. If the engine is raised excessively, the vehicle may also be lifted up.

      NOTE:
      • Make sure that the engine assembly with transaxle is clear of all wiring and hoses.
      • While raising the engine assembly with transaxle into the vehicle, do not allow it to contact the vehicle.
    3. Connect the front suspension crossmember sub-assembly to the vehicle with the 6 bolts.

      Torque: 141 N*m (1438 kgf*cm, 104 ft.*lbf) 

    4. Install the engine mounting insulator LH to the engine mounting bracket LH with the bolt and nut.

      Torque: 44 N*m (449 kgf*cm, 32 ft.*lbf) 

      NOTE:

      While holding the nut in place, tighten the bolt.

    5. Install the engine mounting insulator sub-assembly RH to the engine mounting bracket RH with the 2 bolts and nut.

      Bolt 

      Torque: 72 N*m (734 kgf*cm, 53 ft.*lbf) 

      Nut 

      Torque: 41 N*m (418 kgf*cm, 30 ft.*lbf) 

  18. INSTALL REAR SIDE RAIL REINFORCEMENT SUB-ASSEMBLY LH 

    Refer to PROCEDURE - Step 17

  19. INSTALL REAR SIDE RAIL REINFORCEMENT SUB-ASSEMBLY RH 

    HINT: 

    Use the same procedure as for the LH side.

  20. INSTALL DRIVE PLATE AND TORQUE CONVERTER ASSEMBLY SETTING BOLT 

    Refer to PROCEDURE - Step 14

  21. INSTALL FLYWHEEL HOUSING UNDER COVER 

    Refer to PROCEDURE - Step 22

  22. INSTALL DRIVE SHAFT ASSEMBLY 

    Refer to INSTALLATION [02/2017 - 09/2019]

  23. INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Front and Rear Catalyst) 

    Refer to PROCEDURE - Step 5

  24. INSTALL FRONT FLOOR CENTER BRACE 

    Refer to PROCEDURE - Step 6

  25. INSTALL FRONT FLOOR COVER LH 

    Refer to PROCEDURE - Step 7

  26. INSTALL FRONT FLOOR COVER RH 

    HINT: 

    Use the same procedure as for the LH side.

  27. CONNECT NO. 1 STEERING COLUMN HOLE COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 6

  28. CONNECT NO. 2 STEERING INTERMEDIATE SHAFT ASSEMBLY 

    Refer to PROCEDURE - Step 3

  29. INSTALL COLUMN HOLE COVER SILENCER SHEET 

    Refer to PROCEDURE - Step 5

  30. CONNECT SUCTION HOSE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 3

  31. CONNECT DISCHARGE HOSE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 4

  32. CONNECT FUEL TUBE SUB-ASSEMBLY 
    1. Connect the fuel tube connector to the fuel pipe.
      WARNING:

      Align the fuel tube connector with the fuel pipe, then push the fuel tube connector in until the retainer makes a "click" sound. If it is difficult to push the fuel tube connector in, apply a small amount of engine oil to the tip of the fuel pipe. After connecting, pull the fuel pipe and fuel tube connector to make sure that they are securely connected.

    2. Engage the claw and install the No. 1 fuel pipe clamp.
  33. CONNECT INLET HEATER WATER HOSE 
    1. Connect the inlet heater water hose to the No. 1 water by-pass pipe and slide the clip to secure it.
  34. CONNECT OUTLET HEATER WATER HOSE 
    1. Connect the outlet heater water hose to the No. 3 water by-pass hose and slide the clip to secure it.
    2. Engage the clamp.
  35. CONNECT UNION TO CONNECTOR TUBE HOSE 
    1. Connect the union to connector tube hose to the vacuum pump assembly and slide the clip to secure it.
  36. CONNECT FUEL VAPOR FEED HOSE 
    1. Connect the fuel vapor feed hose to the purge valve (purge VSV) and slide the clip to secure it.
  37. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY 

    Refer to PROCEDURE - Step 37

  38. CONNECT NO. 2 RADIATOR HOSE 
    1. Connect the No. 2 radiator hose to the water inlet and slide the clip to secure it.
  39. CONNECT NO. 1 RADIATOR HOSE 
    1. Connect the No. 1 radiator hose to the cylinder head sub-assembly and slide the clip to secure it.
  40. INSTALL BATTERY CLAMP SUB-ASSEMBLY 
    1. Install the battery clamp sub-assembly to the vehicle with the 3 bolts.

      Torque: 15.4 N*m (157 kgf*cm, 11 ft.*lbf) 

    2. Engage the clamp to connect the engine wire to the battery clamp sub-assembly.
  41. CONNECT ENGINE WIRE 
    1. Connect the engine wire to the transaxle assembly with the bolt.

      Torque: 8.5 N*m (87 kgf*cm, 75 in.*lbf) 

    2. Connect the engine wire to the positive (+) battery terminal with the 3 nuts.

      Torque: 7.6 N*m (77 kgf*cm, 67 in.*lbf) 

    3. Connect the engine wire to the battery clamp sub-assembly with the bolt and nut.

      Torque: 7.0 N*m (71 kgf*cm, 62 in.*lbf) 

    4. Connect the engine wire to the vehicle with the 2 bolts.
      GTY768017Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *A for Type A
      *B for Type B

      for Type A 

      Torque: 8.5 N*m (87 kgf*cm, 75 in.*lbf) 

      for Type B 

      Torque: 10.5 N*m (107 kgf*cm, 8 ft.*lbf) 

  42. INSTALL ECM 

    Refer to INSTALLATION [02/2017 - 08/2020]

  43. INSTALL BATTERY 

    Refer to INSTALLATION [02/2017 - 08/2020]

  44. ADD ENGINE OIL 

    Refer to PROCEDURE - Step 5

  45. ADD ENGINE COOLANT 

    Refer to PROCEDURE - Step 3

  46. ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID 

    Refer to ADJUSTMENT [02/2017 - ]

  47. CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT 

    Refer to PROCEDURE - Step 2

  48. WARM UP ENGINE 

    Refer to PROCEDURE - Step 3

  49. INSPECT SHIFT LEVER POSITION 

    Refer to PROCEDURE - Step 2

  50. ADJUST SHIFT LEVER POSITION 

    Refer to PROCEDURE - Step 4

  51. INSPECT FOR OIL LEAK 

    Refer to PROCEDURE - Step 6

  52. INSPECT FOR COOLANT LEAK 

    Refer to PROCEDURE - Step 1

  53. INSPECT FOR CONTINUOUSLY VARIABLE TRANSAXLE FLUID LEAK 
  54. INSPECT FOR REFRIGERANT LEAK 

    Refer to PROCEDURE - Step 4

  55. INSPECT FOR FUEL LEAK 

    Refer to PROCEDURE - Step 1

  56. INSPECT FOR EXHAUST GAS LEAK 

    Refer to PROCEDURE - Step 7

  57. CHECK ENGINE OIL LEVEL 

    Refer to PROCEDURE - Step 1

  58. INSPECT ENGINE COOLANT LEVEL IN RESERVOIR TANK 

    Refer to PROCEDURE - Step 2

  59. INSTALL REAR ENGINE UNDER COVER LH 
    1. Install the rear engine under cover LH to the vehicle with the 6 clips.
  60. INSTALL REAR ENGINE UNDER COVER RH 
    1. Install the rear engine under cover RH to the vehicle with the 6 clips.
  61. INSTALL NO. 1 ENGINE UNDER COVER 
    1. Install the No. 1 engine under cover to the vehicle with the 4 bolts, 4 screws and 4 clips.

      Bolt 

      Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf) 

      GTY751060Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *1 Bolt
  62. INSTALL FRONT WHEELS 

    Refer to PROCEDURE - Step 1

  63. ALIGN FRONT WHEELS FACING STRAIGHT AHEAD 
  64. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT 

    Refer to ADJUSTMENT [02/2017 - 10/2017]

  65. PERFORM INITIALIZATION 

    Refer to PROCEDURE - Step 7

  66. INSPECT IGNITION TIMING 

    See step  8

  67. INSPECT ENGINE IDLE SPEED 

    See step  9

  68. INSPECT CO/HC 

    See step  11

  69. INSTALL NO. 2 CYLINDER HEAD COVER 

    Refer to PROCEDURE - Step 4

  70. CHECK SPEED SENSOR SIGNAL 

    Refer to TEST MODE PROCEDURE [02/2017 - 10/2017]