LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2014 >> IS 350 Base, AWD >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine Mechanical System (2GR-FSE) - Service Information (2 Of 2) >> Engine Unit >> Installation [04/2013 - 10/2017] >> Procedure

Installation [04/2013 - 10/2017]: Procedure

  1. INSTALL IGNITION COIL ASSEMBLY 

    Refer to PROCEDURE - Step 2

  2. INSTALL V-BANK COVER BRACKET SUB-ASSEMBLY 
    1. Install the V-bank cover bracket sub-assembly to the cylinder head cover sub-assembly RH with the bolt.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

  3. INSTALL WIRE HARNESS CLAMP BRACKET 
    1. Install the wire harness clamp bracket to the camshaft housing sub-assembly RH with the bolt.

      Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf) 

  4. INSTALL NO. 3 FUEL PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 5

  5. INSTALL NO. 2 FUEL PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 1

  6. INSTALL FUEL PUMP ASSEMBLY 

    Refer to PROCEDURE - Step 2

  7. CONNECT NO. 2 FUEL PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 3

  8. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 4

  9. INSTALL FUEL PRESSURE PULSATION DAMPER ASSEMBLY 

    Refer to PROCEDURE - Step 1 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 1 [08/2015 - 10/2017]

  10. INSTALL INTAKE MANIFOLD 

    Refer to PROCEDURE - Step 2

  11. INSTALL FUEL TUBE SUB-ASSEMBLY 
    1. Install the fuel tube sub-assembly with the 2 bolts.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

    2. Connect the fuel tube sub-assembly to the fuel delivery pipe sub-assembly and slide the clip to secure it.

      Refer to PRECAUTION [04/2013 - 10/2017]

  12. INSTALL NO. 3 WATER BY-PASS PIPE 
    1. Connect the No. 9 water by-pass hose to the rear water by-pass joint and slide the clip to secure it.
    2. Connect the No. 8 water by-pass hose to the water outlet pipe assembly and slide the clip to secure it.
    3. Install the No. 3 water by-pass pipe to the camshaft housing sub-assembly RH with the bolt.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

  13. INSTALL NO. 2 SURGE TANK STAY 
    1. Install the No. 2 surge tank stay to the camshaft housing sub-assembly LH with the bolt.

      Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf) 

    2. Connect the 2 clamps to the No. 2 surge tank stay.
  14. INSTALL INTAKE AIR SURGE TANK ASSEMBLY 

    Refer to PROCEDURE - Step 4

  15. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY 

    Refer to PROCEDURE - Step 2 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 2 [08/2015 - 10/2017]

  16. INSTALL INJECTOR DRIVER 

    Refer to PROCEDURE - Step 1

  17. INSTALL ENGINE WIRE 
    1. Install the engine wire to the engine assembly.
  18. INSTALL WATER PUMP PULLEY 

    Refer to PROCEDURE - Step 4

  19. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY 

    Refer to PROCEDURE - Step 21

  20. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH 
    1. Install the front No. 1 engine mounting bracket LH to the cylinder block sub-assembly with the 4 bolts.

      Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf) 

    2. Connect the 2 clamps.
  21. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH 
    1. Install the front No. 1 engine mounting bracket RH to the cylinder block sub-assembly with the 4 bolts.

      Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf) 

  22. INSTALL COMPRESSOR AND MAGNETIC CLUTCH (for 2WD) 

    Refer to PROCEDURE - Step 2 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 2 [08/2015 - 10/2017]

  23. TEMPORARILY TIGHTEN COMPRESSOR AND MAGNETIC CLUTCH (for AWD) 

    Refer to PROCEDURE - Step 5 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 5 [08/2015 - 10/2017]

  24. INSTALL OIL FILTER BRACKET (for AWD) 

    Refer to PROCEDURE - Step 4 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 4 [08/2015 - 10/2017]

  25. INSTALL COMPRESSOR AND MAGNETIC CLUTCH (for AWD) 

    Refer to PROCEDURE - Step 5 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 5 [08/2015 - 10/2017]

  26. INSTALL GENERATOR ASSEMBLY 

    Refer to PROCEDURE - Step 1

  27. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 2

  28. INSTALL NO. 1 ENGINE COVER 

    Refer to PROCEDURE - Step 2

  29. INSTALL NO. 2 ENGINE COVER 
    1. Install the No. 2 engine cover with the 3 clips.
    2. Connect the clamp to the No. 2 engine cover.
  30. INSTALL V-RIBBED BELT 

    Refer to PROCEDURE - Step 1