Install the electric changeover valve for the vacuum control of the coolant pump
NOTE:
TECHNICAL INFORMATION
Detents, guides and mounting elements must not be damaged or missing.
Detents, guides and mounting elements must not be damaged or missing.
- Connect the electric changeover valve (4) to the holder.
- Make sure that the green O-ring between the red vacuum hose (2)
and the electric changeover valve (4)
is installed correctly.
The vacuum hose (2) is red.
The vacuum hose (3) is black.
- Connect plug (1).
- Connect the vacuum hoses (2) and (3) to the electric changeover valve (4).
Follow-up work
- Refer to INSTALLING THE INTAKE PLENUM .
- Refer to INSTALLING ACOUSTIC COVER AT FRONT .
- Refer to INSTALLING BOTH COOLANT EXPANSION TANKS .
- Refer to INSTALLING INTAKE SILENCER HOUSING .
- Refer to INSTALLING THE DESIGN COVER .
- Refer to INSTALLING THE FRONT UNDERBODY PROTECTION .
- Refer to INSTALLING CORROSION PROTECTION COVER .
- Refer to INSTALLING SOUND INSULATION AT THE CENTER OF THE BULKHEAD UPPER PART .
- Refer to REMOVING/INSTALLING TRAILING LINK AT TENSION STRUT TOWER .
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT ON THE RIGHT .
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT ON THE LEFT .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to INSTALLING BATTERY HOUSING (ENGINE COMPARTMENT) .
- Refer to INSTALLING AUXILIARY BATTERY (ENGINE COMPARTMENT) .
- Refer to CONNECTING NEGATIVE BATTERY CABLE (ENGINE COMPARTMENT) .
- Refer to FILLING THE LOW-TEMPERATURE COOLANT CIRCUIT WITH THE VACUUM FILLER DEVICE .
- Refer to BLEEDING THE LOW-TEMPERATURE COOLING SYSTEM .
- Refer to CHECKING LOW-TEMPERATURE COOLING SYSTEM FOR WATERTIGHTNESS .
- Refer to FILLING THE HIGH-TEMPERATURE COOLING SYSTEM WITH THE VACUUM FILLER DEVICE .
- Refer to BLEEDING THE HIGH-TEMPERATURE COOLANT SYSTEM .
- Refer to CHECKING THE HIGH-TEMPERATURE COOLING SYSTEM FOR WATERTIGHTNESS .