LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2021 >> Camry LE, FWD >> Repair and Diagnosis >> Restraints >> Air Bag, SRS >> Supplemental Restraint System - Service Information (1 Of 2) (Except Hybrid) >> KNEE AIRBAG ASSEMBLY (for Front Passenger Side) >> Installation [06/2017 - ] >> Procedure

Installation [06/2017 - ]: Procedure

  1. INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY 
    1. Check that the ignition switch is off.
    2. Check that the cable is disconnected from the negative (-) battery terminal.
      WARNING:

      Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system.

      GTY684647Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Connect the airbag connector to the lower No. 2 instrument panel airbag assembly.
      GTY756435Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Airbag Connector
      *b Airbag Connector Locking Button
      Push in this Direction
      NOTE:

      When connecting any airbag connector, take care not to damage the airbag wire harness.

    4. Push in the airbag connector locking button to install the airbag connector.
    5. Engage the 3 claws to temporarily install the lower No. 2 instrument panel airbag assembly.
    6. Install the lower No. 2 instrument panel airbag assembly with the 3 bolts.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

      NOTE:

      Confirm that the lower No. 2 instrument panel airbag assembly is installed securely without any excessive gaps and is not protruding outward.

  2. INSTALL INSTRUMENT PANEL FINISH PLATE GARNISH 

    Refer to PROCEDURE - Step 11 [06/2017 - 09/2019] , or refer to PROCEDURE - Step 10 [09/2019 - 03/2020] , or refer to PROCEDURE - Step 10 [03/2020 - ]

  3. INSTALL NO. 2 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 12 [06/2017 - 09/2019] , or refer to PROCEDURE - Step 11 [09/2019 - 03/2020] , or refer to PROCEDURE - Step 11 [03/2020 - ]

  4. INSTALL NO. 1 METER HOOD CLUSTER 

    Refer to PROCEDURE - Step 13 [06/2017 - 09/2019] , or refer to PROCEDURE - Step 12 [09/2019 - 03/2020] , or refer to PROCEDURE - Step 12 [03/2020 - ]

  5. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 11 [06/2017 - 10/2020] , or refer to PROCEDURE - Step 11 [10/2020 - ]

  6. INSTALL INSTRUMENT SIDE PANEL RH 

    Refer to PROCEDURE - Step 12 [06/2017 - 10/2020] , or refer to PROCEDURE - Step 12 [10/2020 - ]

  7. CONNECT FRONT DOOR OPENING TRIM WEATHERSTRIP RH 
  8. INSTALL COWL SIDE TRIM SUB-ASSEMBLY RH 

    HINT: 

    Use the same procedure as for the LH side.

    Refer to PROCEDURE - Step 30 [06/2017 - 08/2018] , or refer to PROCEDURE - Step 30 [08/2018 - 09/2019] , or refer to PROCEDURE - Step 27 [09/2019 - 03/2020] , or refer to PROCEDURE - Step 27 [03/2020 - 08/2021] , or refer to PROCEDURE - Step 27 [08/2021 - ]

  9. INSTALL FRONT DOOR SCUFF PLATE RH 

    HINT: 

    Use the same procedure as for the LH side.

    Refer to PROCEDURE - Step 31 [06/2017 - 08/2018] , or refer to PROCEDURE - Step 31 [08/2018 - 09/2019] , or refer to PROCEDURE - Step 28 [09/2019 - 03/2020] , or refer to PROCEDURE - Step 28 [03/2020 - 08/2021] , or refer to PROCEDURE - Step 28 [08/2021 - ]

  10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    For A25A-FKS: Refer to PROCEDURE - Step 2 [03/2017 - 08/2018] , or refer to PROCEDURE - Step 2 [08/2018 - ]

    For 2GR-FKS: Refer to PROCEDURE - Step 2

    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Refer to INITIALIZATION [06/2017 - 08/2018] , or refer to INITIALIZATION [08/2018 - 09/2019] , or refer to INITIALIZATION [09/2019 - 03/2020] , or refer to INITIALIZATION [03/2020 - 10/2020] , or refer to INITIALIZATION [10/2020 - 08/2022] , or refer to INITIALIZATION [08/2022 - ]

  11. PERFORM DIAGNOSTIC SYSTEM CHECK 

    Refer to DTC CHECK / CLEAR [03/2017 - ]

  12. INSPECT SRS WARNING LIGHT 

    Refer to OPERATION CHECK [06/2017 - 09/2019] , or refer to OPERATION CHECK [09/2019 - 10/2020] , or refer to OPERATION CHECK [10/2020 - 08/2022] , or refer to OPERATION CHECK [08/2022 - ]