Installation [12/2021 - ]: Procedure
- INSTALL ENGINE HANGER
Refer to PROCEDURE - Step 42
- REMOVE ENGINE FROM ENGINE STAND
- Remove the engine assembly from the engine stand.
- INSTALL COMPRESSOR WITH PULLEY ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL GENERATOR ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL FAN AND GENERATOR V BELT
Refer to PROCEDURE - Step 1
- INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL ENGINE ASSEMBLY
Refer to PROCEDURE - Step 13
- INSTALL NO. 5 WATER BY-PASS HOSE
- Install the No. 5 water by-pass hose to the No. 3 water by-pass pipe and oil cooler and slide the 2 clips to secure them.
- Engage the 2 clamps.
- INSTALL NO. 3 WATER BY-PASS HOSE
- Install the No. 3 water by-pass hose to the cylinder head sub-assembly and oil cooler and slide the 2 clips to secure them.
- Engage the clamp.
- INSTALL ENGINE WIRE
- Connect all the connectors and clamps, and install the engine wire to the engine assembly with transaxle.
- INSTALL FLYWHEEL HOUSING SIDE COVER
- Install the flywheel housing side cover to the cylinder block sub-assembly.
- INSTALL STARTER ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL ENGINE MOUNTING INSULATOR SUB-ASSEMBLY RH
HINT:
Perform this procedure only when replacement of the engine mounting insulator sub-assembly RH is necessary.
- Temporarily install the engine mounting insulator sub-assembly RH to the vehicle.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
*a Temporarily Tighten - Install the 2 bolts and nut in the order shown in the illustration.
Torque: 72 N*m (734 kgf*cm, 53 ft.*lbf)
- Connect the air conditioner tube and accessory assembly to the engine mounting insulator sub-assembly RH with the bolt and nut.
Bolt
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
Nut
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
- Install the No. 2 earth wire to the engine mounting insulator sub-assembly RH and vehicle with the 2 bolts.
Torque: 10.5 N*m (107 kgf*cm, 8 ft.*lbf)
- Temporarily install the engine mounting insulator sub-assembly RH to the vehicle.
- INSTALL ENGINE MOUNTING INSULATOR LH
HINT:
Perform this procedure only when replacement of the engine mounting insulator LH is necessary.
- REMOVE ENGINE HANGER
Refer to PROCEDURE - Step 56
- INSTALL WIRE HARNESS CLAMP BRACKET
- Install the wire harness clamp bracket with the bolt.
Torque: 39 N*m (398 kgf*cm, 29 ft.*lbf)
- Connect the air fuel ratio sensor connector.
- Engage the 5 clamps.
- Install the wire harness clamp bracket with the bolt.
- INSTALL ENGINE ASSEMBLY WITH TRANSAXLE
- Using height adjustment attachments and plate lift attachments to keep the engine assembly with transaxle and front suspension crossmember sub-assembly level, set an engine lifter underneath the engine assembly with transaxle and front suspension crossmember sub-assembly.NOTE:
- Using height adjustment attachments and plate lift attachments, keep the engine assembly with transaxle horizontal.
- Do not perform any procedures while the engine assembly is suspended because doing so may cause the engine assembly to drop, resulting in injury. However, the engine assembly needs to be suspended when it is installed to or removed from an engine stand.
- To prevent the oil pan sub-assembly from deforming, do not place any attachments under the oil pan sub-assembly of the engine assembly with transaxle.
- Operate the engine lifter and install the engine assembly with transaxle to the vehicle.WARNING:
Do not raise the engine assembly with transaxle more than necessary. If the engine is raised excessively, the vehicle may also be lifted up.
NOTE:- Make sure that the engine assembly with transaxle is clear of all wiring and hoses.
- While raising the engine assembly with transaxle into the vehicle, do not allow it to contact the vehicle.
- Connect the front suspension crossmember sub-assembly to the vehicle with the 6 bolts.
Torque: 141 N*m (1438 kgf*cm, 104 ft.*lbf)
- Install the engine mounting insulator LH to the engine mounting bracket LH with the bolt and nut.
Torque: 44 N*m (449 kgf*cm, 32 ft.*lbf)
NOTE:While holding the nut in place, tighten the bolt.
- Install the engine mounting insulator sub-assembly RH to the engine mounting bracket RH with the 2 bolts and nut.
Bolt
Torque: 72 N*m (734 kgf*cm, 53 ft.*lbf)
Nut
Torque: 41 N*m (418 kgf*cm, 30 ft.*lbf)
- Using height adjustment attachments and plate lift attachments to keep the engine assembly with transaxle and front suspension crossmember sub-assembly level, set an engine lifter underneath the engine assembly with transaxle and front suspension crossmember sub-assembly.
- INSTALL REAR SIDE RAIL REINFORCEMENT SUB-ASSEMBLY LH
Refer to PROCEDURE - Step 18
- INSTALL REAR SIDE RAIL REINFORCEMENT SUB-ASSEMBLY RH
HINT:
Use the same procedure as for the LH side.
- INSTALL DRIVE PLATE AND TORQUE CONVERTER ASSEMBLY SETTING BOLT
Refer to PROCEDURE - Step 21
- INSTALL FLYWHEEL HOUSING UNDER COVER
Refer to PROCEDURE - Step 22
- INSTALL DRIVE SHAFT ASSEMBLY
Refer to INSTALLATION [09/2019 - ]
- INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Front and Rear Catalyst)
Refer to PROCEDURE - Step 5
- INSTALL FRONT FLOOR CENTER BRACE
Refer to PROCEDURE - Step 6
- INSTALL FRONT FLOOR COVER LH (w/ Cover)
Refer to PROCEDURE - Step 7
- INSTALL FRONT FLOOR COVER RH (w/ Cover)
HINT:
Use the same procedure as for the LH side.
- CONNECT NO. 1 STEERING COLUMN HOLE COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 7
- CONNECT NO. 2 STEERING INTERMEDIATE SHAFT ASSEMBLY
Refer to PROCEDURE - Step 4
- INSTALL COLUMN HOLE COVER SILENCER SHEET
Refer to PROCEDURE - Step 5
- CONNECT SUCTION HOSE SUB-ASSEMBLY
Refer to PROCEDURE - Step 3
- CONNECT DISCHARGE HOSE SUB-ASSEMBLY
Refer to PROCEDURE - Step 4
- CONNECT FUEL TUBE SUB-ASSEMBLY
- Connect the fuel tube connector to the fuel pipe.WARNING:
Align the fuel tube connector with the fuel pipe, then push the fuel tube connector in until the retainer makes a "click" sound. If it is difficult to push the fuel tube connector in, apply a small amount of engine oil to the tip of the fuel pipe. After connecting, pull the fuel pipe and fuel tube connector to make sure that they are securely connected.
- Engage the claw and install the No. 1 fuel pipe clamp.
- Connect the fuel tube connector to the fuel pipe.
- CONNECT INLET HEATER WATER HOSE
- Connect the inlet heater water hose to the No. 1 water by-pass pipe and slide the clip to secure it.
- CONNECT OUTLET HEATER WATER HOSE
- Connect the outlet heater water hose to the No. 3 water by-pass hose and slide the clip to secure it.
- Engage the clamp.
- CONNECT UNION TO CONNECTOR TUBE HOSE
- Connect the union to connector tube hose to the vacuum pump assembly and slide the clip to secure it.
- CONNECT FUEL VAPOR FEED HOSE
- Connect the fuel vapor feed hose to the purge valve (purge VSV) and slide the clip to secure it.
- CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Refer to PROCEDURE - Step 37
- CONNECT NO. 2 RADIATOR HOSE
- Connect the No. 2 radiator hose to the water inlet and slide the clip to secure it.
- CONNECT NO. 1 RADIATOR HOSE
- Connect the No. 1 radiator hose to the cylinder head sub-assembly and slide the clip to secure it.
- INSTALL BATTERY CLAMP SUB-ASSEMBLY
- Install the battery clamp sub-assembly to the vehicle with the 3 bolts.
Torque: 15.4 N*m (157 kgf*cm, 11 ft.*lbf)
- Engage the clamp to connect the engine wire to the battery clamp sub-assembly.
- Install the battery clamp sub-assembly to the vehicle with the 3 bolts.
- CONNECT ENGINE WIRE
- Connect the engine wire to the transaxle assembly with the bolt.
Torque: 8.5 N*m (87 kgf*cm, 75 in.*lbf)
- Connect the engine wire to the positive (+) battery terminal with the 3 nuts.
Torque: 7.6 N*m (77 kgf*cm, 67 in.*lbf)
- Connect the engine wire to the battery clamp sub-assembly with the bolt and nut.
Torque: 7.0 N*m (71 kgf*cm, 62 in.*lbf)
- Connect the engine wire to the vehicle with the 2 bolts.
*A for Type A *B for Type B for Type A
Torque: 8.5 N*m (87 kgf*cm, 75 in.*lbf)
for Type B
Torque: 10.5 N*m (107 kgf*cm, 8 ft.*lbf)
- Connect the engine wire to the transaxle assembly with the bolt.
- INSTALL ECM
Refer to INSTALLATION [08/2020 - ]
- INSTALL BATTERY
Refer to INSTALLATION [08/2020 - ]
- ADD ENGINE OIL
Refer to PROCEDURE - Step 5
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 3
- ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID
Refer to ADJUSTMENT [02/2017 - ]
- CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT
Refer to PROCEDURE - Step 2
- WARM UP ENGINE
Refer to PROCEDURE - Step 3
- INSPECT SHIFT LEVER POSITION
Refer to PROCEDURE - Step 2
- ADJUST SHIFT LEVER POSITION
Refer to PROCEDURE - Step 4
- INSPECT FOR ENGINE OIL LEAK
Refer to PROCEDURE - Step 6
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 1
- INSPECT FOR CONTINUOUSLY VARIABLE TRANSAXLE FLUID LEAK
- INSPECT FOR REFRIGERANT LEAK
Refer to PROCEDURE - Step 4
- INSPECT FOR FUEL LEAK
Refer to ON-VEHICLE INSPECTION [08/2020 - ]
- INSPECT FOR EXHAUST GAS LEAK
Refer to PROCEDURE - Step 7
- CHECK ENGINE OIL LEVEL
Refer to PROCEDURE - Step 1
- INSPECT ENGINE COOLANT LEVEL IN RESERVOIR TANK
Refer to PROCEDURE - Step 2
- INSTALL REAR ENGINE UNDER COVER LH
- Install the rear engine under cover LH to the vehicle with the 6 clips.
- INSTALL REAR ENGINE UNDER COVER RH
- Install the rear engine under cover RH to the vehicle with the 6 clips.
- INSTALL NO. 1 ENGINE UNDER COVER
- INSTALL FRONT WHEELS
Refer to PROCEDURE - Step 1
- ALIGN FRONT WHEELS FACING STRAIGHT AHEAD
- INSPECT AND ADJUST FRONT WHEEL ALIGNMENT
Refer to ADJUSTMENT [12/2021 - ]
- PERFORM INITIALIZATION
Refer to PROCEDURE - Step 7
- INSPECT IGNITION TIMING
Refer to PROCEDURE - Step 8
- INSPECT ENGINE IDLE SPEED
Refer to PROCEDURE - Step 9
- INSPECT CO/HC
Refer to PROCEDURE - Step 11
- INSTALL NO. 2 CYLINDER HEAD COVER
Refer to PROCEDURE - Step 4
- CHECK SPEED SENSOR SIGNAL
Refer to TEST MODE PROCEDURE [12/2021 - ]