Charging System (2GR-FE): Removal: Installation
- INSTALL GENERATOR ASSEMBLY
- Install the wire harness clamp stay with the bolt.
Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf)
- Connect the generator bracket with the wire harness clamp.
- Install generator assembly with the 2 bolts.
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf)
- Temporally install the 2 bolts.
- Fully tighten the 2 bolts.
Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf)
- Connect the generator connector to the generator assembly.
- Install the generator wire with the nut.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Install the terminal cap.
- Connect the 3 wire harness clamps.
- Connect the magnetic clutch connector to the compressor and magnetic clutch.
- Install the wire harness clamp stay with the bolt.
- INSTALL V-RIBBED BELT (See INSTALLATION )
- INSTALL NO. 2 OIL LEVEL DIPSTICK GUIDE
- Install a new O-ring to the No. 2 oil level dipstick guide.
- Apply a light coat of engine oil to the O-ring.
- Push in the No. 2 oil level dipstick guide end into the No. 1 oil level dipstick guide.
- Install the No. 2 oil level dipstick guide with the bolt.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- INSTALL RADIATOR ASSEMBLY AND FAN ASSEMBLY WITH MOTOR (See INSTALLATION )
- INSTALL COOLER CONDENSER ASSEMBLY (See INSTALLATION )
- INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY (See INSTALLATION )
- INSTALL HOOD LOCK ASSEMBLY (w/o Engine Hood Courtesy Switch) (See INSTALLATION )
- INSTALL HOOD LOCK ASSEMBLY (w/ Engine Hood Courtesy Switch) (See INSTALLATION )
- INSTALL RADIATOR GRILLE (See INSTALLATION )
- CONNECT COOLING FAN ECU CONNECTOR (See INSTALLATION )
- CONNECT OIL COOLER HOSE (See INSTALLATION )
- CONNECT NO. 2 RADIATOR HOSE (See INSTALLATION )
- CONNECT NO. 1 RADIATOR HOSE (See INSTALLATION )
- INSTALL NO. 1 AIR CLEANER INLET (See INSTALLATION )
- INSTALL NO. 2 AIR CLEANER INLET (See INSTALLATION )
- INSTALL BATTERY (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- INSTALL FRONT FENDER APRON SEAL RH (See INSTALLATION )
- INSTALL FRONT FENDER LINER RH (See INSTALLATION )
- INSTALL FRONT FENDER MOULDING SUB-ASSEMBLY RH
HINT:
Use the same procedures for the RH side and LH side (See INSTALLATION ).
- ADD ENGINE COOLANT (See REPLACEMENT )
- INSPECT FOR COOLANT LEAK (See COOLING SYSTEM )
- INSPECT AUTOMATIC TRANSAXLE FLUID (See INSTALLATION )
- INSPECT FOR OIL LEAK
- INSTALL NO. 1 ENGINE UNDER COVER (See INSTALLATION )
- INSTALL ENGINE UNDER COVER ASSEMBLY (See INSTALLATION )
- INSTALL FRONT WHEEL RH
Torque: 103 N*m (1050 kgf*cm, 76 ft.*lbf)
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )