Engine Cooling System (2GR-FE): Radiator: Installation
- INSTALL LOWER RADIATOR SUPPORT
- Install the 2 lower radiator supports.
- INSTALL RADIATOR SUPPORT CUSHION
- Install the 2 radiator support cushions.
- INSTALL FAN ASSEMBLY WITH MOTOR
- Put in the fan assembly with motor to the radiator assembly.
- Install the fan assembly with motor with the 3 bolts.
Torque: 7.8 N*m (80 kgf*cm, 69 in.*lbf)
- Connect the radiator reserve tank hose or pipe to the radiator assembly.
- INSTALL RADIATOR ASSEMBLY AND FAN ASSEMBLY WITH MOTOR
- Install the radiator assembly and fan assembly with motor.
- INSTALL COOLER CONDENSER ASSEMBLY
- Install the cooler condenser assembly with the 4 bolts.
Torque: 6.0 N*m (61 kgf*cm, 53 in.*lbf)
- INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY
- Install the upper radiator support sub-assembly with the 6 bolts and attach the hood lock control cable clamp to the radiator support.
Torque: Bolt A
9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Connect the low pitched horn and high pitched horn connectors.
- Install the upper radiator support sub-assembly with the 6 bolts and attach the hood lock control cable clamp to the radiator support.
- INSTALL HOOD LOCK ASSEMBLY (w/o Engine Hood Courtesy Switch) (See INSTALLATION )
- INSTALL HOOD LOCK ASSEMBLY (w/ Engine Hood Courtesy Switch) (See INSTALLATION )
- INSTALL RADIATOR GRILLE (See INSTALLATION )
- CONNECT COOLING FAN ECU CONNECTOR
- Connect the cooling fan ECU connector and attach the wire harness clamps to the fan shroud RH side.
- Attach the wire harness clamps to the fan shroud LH side.
- CONNECT OIL COOLER HOSE
- Connect the oil cooler hoses to the radiator.
- CONNECT NO. 2 RADIATOR HOSE
- Connect the No. 2 radiator hose to the radiator.
- CONNECT NO. 1 RADIATOR HOSE
- Connect the No. 1 radiator hose to the radiator.
- INSTALL NO. 1 AIR CLEANER INLET (See INSTALLATION )
- INSTALL NO. 2 AIR CLEANER INLET (See INSTALLATION )
- INSTALL BATTERY (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- ADD ENGINE COOLANT (See WATER PUMP )
- INSPECT FOR COOLANT LEAK (See COOLING SYSTEM )
- INSPECT AUTOMATIC TRANSAXLE FLUID
HINT:
- INSPECT FOR OIL LEAK
- INSTALL NO. 1 ENGINE UNDER COVER (See INSTALLATION )
- INSTALL ENGINE UNDER COVER ASSEMBLY (See INSTALLATION )
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )