64 11 206 Removing and installing/replacing heating and air-conditioning unit: Notes
Refrigerant circuit is under high pressure!
Avoid contact with refrigerant and refrigerant fluid.
Read and comply with SAFETY INFORMATION .
Restart engine only when air conditioning system has been correctly filled.
Follow notes for OPENING AND REPLACING PARTS IN REFRIGERANT CIRCUIT .
If air conditioning system is opened for more than 24 hours: Replace DESICCANT INSERT FOR AIR CONDITIONING SYSTEM .
Necessary preliminary work:
- Drain off AIR CONDITIONING SYSTEM
- Remove ACOUSTIC INSULATION FROM BULKHEAD UPPER SECTION
- Remove FAN HOUSING FOR HEATING AND AIR-CONDITIONING UNIT
- Remove LEFT SUSPENSION CROSSBRACE
- Remove SUPPORT FOR DASHBOARD
- Disconnect plug connections
- Unclip wiring harness mountings from heating and air-conditioning unit
Required preliminary work for the replacement of the heating and air-conditioning unit and the subsequent modification of the controller drives:
- Remove RADIO AND AIR CONDITIONING CONTROLS , do not yet disconnect plug connections
- Ignition ON
- Use the BMW diagnosis system to move the controller drives into the installation position as follows:
- Body
- Heating and air conditioning functions
- Flap motors
- Installation position of flap motors
- Disconnect all plug connections from the RADIO AND AIR CONDITIONING CONTROLS
- Ignition off
- Drain off AIR CONDITIONING SYSTEM
- Remove SOUND INSULATION FOR BULKHEAD UPPER PART
- Remove FAN HOUSING FOR HEATING AND AIR-CONDITIONING UNIT
- Remove LEFT SUSPENSION CROSS-BRACE
- Remove SUPPORT FOR DASHBOARD
- Disconnect plug connections
- Unclip the wiring harness mountings from the heating and air-conditioning unit
Recycling:
Coolant emerges when coolant lines are detached. Have a suitable collecting vessel ready.
Catch and dispose of escaping coolant.
Observe country-specific waste disposal regulations.
Feed out line penetration (1) towards top.
Release screws (1) and remove refrigerant lines (2) with associated seal.
Tightening torque 64 53 1AZ .
Installation note:
Replace sealing rings.
Use special tool 00 9 030 to mount sealing rings without damaging them.
Mark connection sequence of water hoses prior to removal.
Release hose clamps (1) with special tool 17 2 050 and detach coolant hoses (2).
Close openings or line to heat exchanger with special tool 32 1 270 , to avoid media leak and dirt contamination.
Equipment specification with electric auxiliary heater only:
Release screw (1).
Remove earthing cable for electric auxiliary heater (2) from floor trim panel (3).
Run excess cable as shown in item (4).
Unlock retaining lug (1) on gaiter (2).
Lever gaiter (2) out of guides.
Installation note:
Make sure retaining lug (1) and adjacent guides are correctly engaged.
Unclip air ducts (2), left and right towards bottom, from heater/air conditioner (1).
Feed out heating and air-conditioning unit (1) in direction of arrow.
Installation note:
Water drain (3) must be inserted on both sides into outlet channel (4).