LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2017 >> GLS63 AMG >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> Air Intake, Turbocharging - 166 Chassis >> Testing & Repair >> Remove/Install Mixing Chamber - AR09.20-P-1320OGR

Remove/Install Mixing Chamber - AR09.20-P-1320OGR

Engine 642 in model 166, 292 

G14134167Courtesy of MERCEDES-BENZ USA
NOTES Information on preventing damage to electronic components due to electrostatic discharge   AH54.00-P-0001-01A
REMOVINGINSTALLING Remove/install     
1 Remove engine air intake duct downstream of air filter   AR09.10-P-8130OGR 
2 Remove engine charge air duct on ATL   AR09.41-P-8622OGR 
3 Remove noise damper downstream of charge air cooler   AR09.40-P-6925GZB 
    INSTALLATION IMPORTANT Check sealing ring for damage and replace if necessary.  
4 Detach charge air hose downstream of charge air cooler from engine charge air duct downstream of charge air cooler   AR09.41-P-8625OGR 
    INSTALLATION IMPORTANT Check sealing ring for damage and replace if necessary.  
5 Disconnect electrical connection (2) on throttle valve actuator    
6 Disconnect electrical connections (3, 4) at glow output stage    
7 Detach electrical connection on charge air temperature sensor (B17/8)    
8 Disconnect electrical connection on boost pressure sensor (B5/1)    
9 Remove screw/bolts (1) on throttle valve actuator holder IMPORTANT Loosen bracket for cylinder head if necessary.  
    TORQUE SPECIFICATION Bracket, throttle valve actuator to cylinder head *BA09.41-P-1006-01J 
10 Disconnect electrical connections (6) and vacuum hose (5) on EGR cooler bypass flap vacuum valve    
11 Remove screw/bolt (7) on glow output stage bracket on cylinder head TORQUE SPECIFICATION M6 *BA00.10-P-1002-01A 
12 Detach coolant line from glow output stage bracket    
13 Remove screw/bolts (9) INSTALLATION IMPORTANT Replace seal.  
    TORQUE SPECIFICATION EGR line to charge air distributor *BA14.20-P-1003-01G 
14 Remove screw/bolts (8) for mixing chamber at the charge air distributor TORQUE SPECIFICATION Screw/bolt, mixing chamber to charge air distributor *BA09.20-P-1001-01Q 
15 Push hose and tubing bracket on the mixing chamber flange upwards    
16 Remove mixing chamber upwards INSTALLATION IMPORTANT Install new sealing rings.  
17 Detach glow output stage Only if mixing chamber is replaced AR15.20-P-4500OGR
18 Detach throttle valve actuator Only if mixing chamber is replaced AR07.51-P-1401OGR
19 Detach boost pressure sensor (B5/1) Only if mixing chamber is replaced AR09.41-P-2006OGR 
20 Detach EGR bypass flap Only if mixing chamber is replaced AR14.20-P-7661CD
21 Install in the reverse order    
DANGER Risk of accident  from vehicle starting off by itself when engine running. Risk of injury  (bruises and burns) resulting from working on the engine while it is being started or when it is running. Secure vehicle to prevent it from starting off by itself. Wear closed and snug-fitting work clothes. Do not touch hot or rotating parts. AS00.00-Z-0005-01A
22 Carry out an engine test run    
HEADLESS SCREWS: BOLTS AND NUTS, COARSE-PITCH THREAD

Number Designation Model all
BA00.10-P-1002-01A M6 8.8 Galvanized Nm 9
Phosphated Nm 9
10.9 Galvanized Nm 13
Phosphated Nm 12
12.9 Galvanized Nm 16
Phosphated Nm 14
INTAKE MANIFOLD

Number Designation Engine 642
BA09.20-P-1001-01Q Screw/bolt, mixing chamber to charge air distributor M6 Nm 9
CHARGE AIR PIPE/CHARGE AIR COOLING

Number Designation Engine 642
BA09.41-P-1006-01J Bracket, throttle valve actuator to cylinder head Nm 9
EXHAUST GAS RECIRCULATION

Number Designation Engine 642.82/83/85/86/87/886/887/9
BA14.20-P-1003-01G EGR line to charge air distributor Nm 13