Install charge air line
- Check sealing ring (1) on the charge air line (3) for damage, if necessary replace with the special tool 0 496 714 (00 9 030) .
- Check sealing ring (2) on the charge air line (3) for damage, if necessary replace with the special tool 0 496 714 (00 9 030)
.
- Insert and install charge air line (4).
- Lock clamp (3).
The clamp (3) must engage audibly.
- Insert and install the coolant hose (2).
- Lock clamp (1).
- Tighten down screws (3).
TIGHTENING TORQUE SPECIFICATIONS
| Charge air line to throttle valve | ||
|---|---|---|
| M6x30 | tightening torque | 8 Nm |
- Connect connectors (2) and lock.
The connector (2) must engage audibly.
- Connect connectors (1) and lock.
The connector (1) must engage audibly.
- Feed in and position auxiliary coolant pump (4).
- Feed in and position retaining bracket (3).
- Tighten nut (2).
TIGHTENING TORQUE SPECIFICATIONS
| Electric coolant pump to holder | ||
|---|---|---|
| M6 | tightening torque | 8 Nm |
- Connect connectors (1) and lock.
The connector (1) must engage audibly.
Follow-up work
- Refer to INSTALLING THE CLEAN AIR PIPE AND THE RESONATOR .
- Refer to INSTALLING THE INTAKE FILTER HOUSING (TENSION STRUT REMOVED ON SHOCK TOWER) .
- Refer to INSTALLING FAN COWL .
- Refer to INSTALLING FRONT UNDERBODY PROTECTION .
- Refer to INSTALLING THE REAR TOP CROSS CONNECTION .
- Refer to INSTALLING TENSION STRUT ON LEFT AND RIGHT SHOCK TOWER .
- Refer to INSTALLING UPPER CROSS CONNECTION .
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT AT TOP LEFT , and INSTALLING THE COVER IN THE ENGINE COMPARTMENT ON THE TOP RIGHT .
- Refer to INSTALLING ACOUSTIC COVER .