EGR Cooler, Removing And Installing: Installation
Install in reverse order of removal. Note the following:
- Tightening specifications. Refer to EXHAUST GAS RECIRCULATION OVERVIEW .
Replace the seals and the o-rings.
Secure all hose connections with hose clamps of the same type as those equipped by the factory.
-- Connect the coolant hose to the coupling, refer to Fig 1.
-- Install the intake flap motors. Refer to OVERVIEW - INTAKE MANIFOLD .
-- Install the coolant line, refer to COOLANT PIPES OVERVIEW .
-- Install the turbocharger heat shield and oil supply line, refer to TURBOCHARGER OVERVIEW .
-- Install the oil filter housing. Refer to OIL FILTER HOUSING, REMOVING AND INSTALLING .
-- Remove the right upper coolant pipe. Refer to UPPER RIGHT COOLANT PIPE, REMOVING AND INSTALLING .
-- Remove the upper left coolant pipe. Refer to LEFT UPPER COOLANT PIPE, THROUGH 05.10, REMOVING AND INSTALLING .
-- Fill the coolant, refer to COOLANT, DRAINING AND FILLING .