Installation [12/2015 - 08/2016]: Procedure
WARNING: This page is about a different car, the 2016 Toyota Sienna. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL THERMOSTAT
- INSTALL WATER INLET
- Install the water inlet with the 2 nuts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Install the water inlet with the 2 nuts.
- INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
Refer to PROCEDURE - Step 7
- CONNECT NO. 2 RADIATOR HOSE
- Connect the No. 2 radiator hose to the water inlet.
- INSTALL V-RIBBED BELT
(Refer to INSTALLATION [12/2015 - 08/2016] )
- ADD ENGINE COOLANT
See step 4
- WARM UP ENGINE
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 1
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 95
- INSTALL FRONT BUMPER COVER
(Refer to INSTALLATION [12/2015 - 11/2017] )
- INSTALL NO. 1 ENGINE UNDER COVER
Refer to PROCEDURE - Step 15