Installation [10/2020 - ]: Procedure
- INSTALL REAR NO. 2 ENGINE MOUNTING INSULATOR
HINT:
Perform this procedure only when replacement of the rear No. 2 engine mounting insulator is necessary.
Refer to PROCEDURE - Step 12
- INSTALL ENGINE MOUNTING BRACKET SUB-ASSEMBLY LH
HINT:
Perform this procedure only when replacement of the engine mounting bracket sub-assembly LH is necessary.
- INSTALL ENGINE MOUNTING SPACER
HINT:
Perform this procedure only when replacement of the engine mounting spacer is necessary.
- INSTALL ENGINE MOUNTING INSULATOR SUB-ASSEMBLY RH
HINT:
Perform this procedure only when replacement of the engine mounting insulator sub-assembly RH is necessary.
- Install the engine mounting insulator sub-assembly RH to the engine mounting spacer and vehicle body with the nut and 2 bolts.
Torque: 72 N*m (734 kgf*cm, 53 ft.*lbf)
NOTE:Temporarily tighten the bolt (A), and then fully tighten the 2 bolts and nut in the order of (B), (A) and (C).
- Engage the clamp.
- Install the bracket to the engine mounting insulator sub-assembly RH with the bolt.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- Install the radiator reserve tank assembly with the bolt and nut in the order shown in the illustration.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Install the engine mounting insulator sub-assembly RH to the engine mounting spacer and vehicle body with the nut and 2 bolts.
- INSTALL ENGINE HANGERS
See step 51 [10/2020 - 08/2022], or See step 51 [08/2022 - 08/2023], or See step 51 [08/2023 - ]
- REMOVE ENGINE ASSEMBLY FROM ENGINE STAND
- Remove the engine assembly from the engine stand.
- INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE
See step 2
- INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY
See step 3
- INSTALL AUTOMATIC TRANSAXLE ASSEMBLY
Refer to PROCEDURE - Step 13
- INSTALL FRONT ENGINE MOUNTING BRACKET
Refer to PROCEDURE - Step 14
- INSTALL REAR ENGINE MOUNTING INSULATOR
HINT:
Perform this procedure only when replacement of the rear engine mounting insulator is necessary.
Refer to PROCEDURE - Step 1
- INSTALL FRONT ENGINE MOUNTING INSULATOR
HINT:
Perform this procedure only when replacement of the front engine mounting insulator is necessary.
- Install the front engine mounting insulator to the front frame assembly with the 3 nuts.
Torque: 72 N*m (734 kgf*cm, 53 ft.*lbf)
- Install the front engine mounting insulator to the front frame assembly with the 3 nuts.
- INSTALL FRONT FRAME ASSEMBLY
- Install the rear engine mounting insulator to the front frame assembly with the 4 nuts.
Torque: 72 N*m (734 kgf*cm, 53 ft.*lbf)
- Install the front engine mounting insulator to the front engine mounting bracket with the bolt.
Torque: 72 N*m (734 kgf*cm, 53 ft.*lbf)
- Install the rear engine mounting insulator to the front frame assembly with the 4 nuts.
- REMOVE ENGINE HANGERS
See step 60 [10/2020 - 08/2022], or See step 60 [08/2022 - 08/2023], or See step 60 [08/2023 - ]
- INSTALL ENGINE WIRE
- Connect all connectors and clamps, and install the engine wire to the engine assembly with transaxle.
- CONNECT WATER BY-PASS HOSE ASSEMBLY
Refer to PROCEDURE - Step 18
- CONNECT NO. 1 WATER BY-PASS HOSE
Refer to PROCEDURE - Step 19
- INSTALL BREATHER PLUG HOSE
Refer to PROCEDURE - Step 20
- INSTALL STARTER ASSEMBLY
Refer to PROCEDURE - Step 1
- CONNECT VACUUM HOSE
Refer to PROCEDURE - Step 22
- INSTALL ENGINE ASSEMBLY WITH TRANSAXLE
HINT:
Perform Inspection After Repair after replacing the engine assembly.
Refer to INITIALIZATION [09/2019 - ]
- Using height adjustment attachments and plate lift attachments to keep the engine assembly with transaxle and front frame assembly level, set an engine lifter underneath the engine assembly with transaxle and front frame assembly.NOTE:
- Do not perform any procedures while the engine assembly is suspended because doing so may cause the engine assembly to drop, resulting in injury. However, the engine assembly needs to be suspended when it is installed to or removed from an engine stand.
- To prevent the engine assembly from unexpectedly moving, securely support the engine assembly until it is secured to an engine stand.
- Operate the engine lifter and install the engine assembly with transaxle to the vehicle.WARNING:
Do not raise the engine assembly with transaxle more than necessary. If the engine is raised excessively, the vehicle may also be lifted up.
NOTE:- Make sure that the engine assembly with transaxle is clear of all wiring and hoses.
- While raising the engine assembly with transaxle into the vehicle, do not allow it to contact the vehicle.
- Install the front bumper extension sub-assembly RH and front bumper extension sub-assembly LH to the front frame assembly and vehicle body with the 8 bolts.
Bolt Nut Bolt (A)
Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf)
Bolt (B)
Torque: 12.5 N*m (127 kgf*cm, 9 ft.*lbf)
Bolt (C)
Torque: 135 N*m (1377 kgf*cm, 100 ft.*lbf)
- Install the front suspension member bracket sub-assembly RH and front suspension member bracket sub-assembly LH to the front frame assembly and vehicle body with the 4 bolts and 2 nuts.
Bolt (D)
Torque: 17.5 N*m (178 kgf*cm, 13 ft.*lbf)
Bolt (E)
Torque: 135 N*m (1377 kgf*cm, 100 ft.*lbf)
Nut
Torque: 17.5 N*m (178 kgf*cm, 13 ft.*lbf)
- Install the rear No. 2 engine mounting insulator to the engine mounting bracket sub-assembly LH with the bolt and nut.
Torque: 42 N*m (428 kgf*cm, 31 ft.*lbf)
- Install the engine mounting insulator sub-assembly RH to the front No. 1 engine mounting bracket LH with the 3 bolts and nut.
Bolt
Torque: 72 N*m (734 kgf*cm, 53 ft.*lbf)
Nut
Torque: 42 N*m (428 kgf*cm, 31 ft.*lbf)
- Install the No. 2 engine mounting stay RH with the bolt and 2 nuts.
Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf)
- Using height adjustment attachments and plate lift attachments to keep the engine assembly with transaxle and front frame assembly level, set an engine lifter underneath the engine assembly with transaxle and front frame assembly.
- INSTALL DRIVE PLATE AND TORQUE CONVERTER ASSEMBLY SETTING BOLT
Refer to PROCEDURE - Step 24
- INSTALL FLYWHEEL HOUSING UNDER COVER
- Install the flywheel housing under cover with the 2 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Install the flywheel housing under cover with the 2 bolts.
- INSTALL NO. 1 EXHAUST PIPE SUPPORT BRACKET (for Upper Side)
- Install the No. 1 exhaust pipe support bracket to the oil pan sub-assembly with the 2 bolts.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Install the No. 1 exhaust pipe support bracket to the oil pan sub-assembly with the 2 bolts.
- INSTALL FRONT DRIVE SHAFT ASSEMBLY
Refer to INSTALLATION [06/2017 - ]
- INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst)
Refer to INSTALLATION [06/2017 - ]
- CONNECT STEERING INTERMEDIATE SHAFT ASSEMBLY
Refer to PROCEDURE - Step 13
- CONNECT EARTH WIRE
- Connect the earth wire to the vehicle body with the 2 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the earth wire to the vehicle body with the 2 bolts.
- CONNECT ENGINE WIRE
- Engage the 2 clamps and connect the engine wire to the vehicle body.
- Connect the engine wire with the bolt.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- Engage the 2 clamps.
- Engage the claw and connect the engine wire to the engine room relay block and junction block assembly.
- Install the nut to the engine room relay block and junction block assembly.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- Connect the 4 connectors to the engine room relay block and junction block assembly.
- Install the No. 2 relay block cover to the engine room relay block and junction block assembly.
- CONNECT SUCTION HOSE SUB-ASSEMBLY
Refer to PROCEDURE - Step 3
- CONNECT NO. 1 COOLER REFRIGERANT DISCHARGE HOSE SUB-ASSEMBLY
Refer to PROCEDURE - Step 4
- CONNECT NO. 1 FUEL HOSE
- Connect the No. 1 fuel hose (for Port Injection).
- Connect the No. 1 fuel hose to the fuel pipe.
Refer to PRECAUTION [09/2019 - ]
- Connect the No. 1 fuel hose to the fuel pipe.
- Connect the No. 1 fuel hose (for Direct Injection).
- Connect the No. 1 fuel hose to the fuel pipe.
Refer to PRECAUTION [09/2019 - ]
- Connect the No. 1 fuel hose to the fuel pipe.
- Install the EFI fuel pipe clamp to the fuel tube connector.
- Engage the 2 claws to install the EFI fuel pipe clamp.
- Connect the No. 1 fuel hose (for Port Injection).
- CONNECT OUTLET HEATER WATER HOSE A
- Connect the outlet heater water hose A to the heater water pipe and slide the clip to secure it.
- CONNECT INLET HEATER WATER HOSE
- Connect the inlet heater water hose to the water outlet and slide the clip to secure it.
- Engage the clamp.
- CONNECT RADIATOR HOSE SUB-ASSEMBLY
- Connect the radiator hose sub-assembly to the water outlet and slide the clip to secure it.
- Install the radiator hose sub-assembly to the engine assembly with the 2 bolts.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- CONNECT NO. 2 RADIATOR HOSE
- Connect the No. 2 radiator hose to the water inlet and slide the clip to secure it.
- CONNECT UNION TO CHECK VALVE HOSE
- Connect the union to check valve hose to the brake booster assembly and slide the clip to secure it.
- CONNECT NO. 1 FUEL VAPOR FEED HOSE
- Connect the No. 1 fuel vapor feed hose to the No. 1 vacuum switching valve and slide the clip to secure it.
- CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
- Connect the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.
- Connect the transmission control cable assembly to the transmission control shaft lever as shown in the illustration.
*a Correct *b Incorrect NOTE:Before installing the transmission control cable assembly, check that the park/neutral position switch assembly and shift lever are in N.
- INSTALL BATTERY CLAMP SUB-ASSEMBLY
- Install the battery clamp sub-assembly with the 3 bolts.
Torque: 18.5 N*m (189 kgf*cm, 14 ft.*lbf)
- Engage the 5 clamps to the battery clamp sub-assembly.
- Install the battery clamp sub-assembly with the 3 bolts.
- INSTALL BATTERY
Refer to PROCEDURE - Step 1
- CONNECT ENGINE ROOM MAIN WIRE
- Connect the engine wire with engine room main wire to the positive (+) battery terminal with the nut.
Torque: 7.6 N*m (77 kgf*cm, 67 in.*lbf)
- Connect the engine wire with engine room main wire to the positive (+) battery terminal with the nut.
- INSTALL ECM
Refer to PROCEDURE - Step 3
- INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
- Install the air cleaner assembly with air cleaner hose to the throttle body with motor assembly.NOTE:
Align the cutout of the air cleaner hose assembly with the protrusion of the throttle body with motor assembly.
*a Protrusion *b Cutout *c Hose Clamp End *d 2.0 mm (0.0787 in.) *e Paint Mark - Tighten the hose clamp in the position shown in the illustration.NOTE:
Make sure that the end of the hose clamp is positioned as shown in the illustration.
- Insert the 3 pins of the air cleaner assembly into the 3 air cleaner supports as shown in the illustration.
*a Air Cleaner Support NOTE:- Insert the 3 pins of the air cleaner assembly into the 3 air cleaner supports at the same time.
- Check that the pins are securely inserted into air cleaner supports.
- Engage the vacuum hose to the air cleaner hose.
- Engage the 3 wire harness clamps.
- Connect the mass air flow meter sub-assembly connector.
- Connect the No. 2 ventilation hose to the air cleaner hose and slide the clip to secure it.
*1 No. 1 Fuel Vapor Feed Hose *2 No. 2 Ventilation Hose *a Top *b Paint Mark *c Rear of Vehicle *d 180° (Claw of Clip Location) NOTE:Make sure that the condition of the clip is as shown in the illustration.
- Engage the 2 clamps to connect the No. 1 fuel vapor feed hose to the air cleaner hose.
- Install the air cleaner assembly with air cleaner hose to the throttle body with motor assembly.
- INSTALL INLET AIR CLEANER ASSEMBLY
- INSTALL V-BANK COVER SUB-ASSEMBLY
- Engage the 4 clips in the order shown in the illustration to install the V-bank cover sub-assembly.NOTE:
- Make sure that the clips are engaged securely.
- Do not subject the clips to shock or apply excessive force to the clips when engaging them or they may be damaged.
- If the clips are not engaged in the order shown in the illustration, the V-bank cover sub-assembly may be damaged.
- Engage the 4 clips in the order shown in the illustration to install the V-bank cover sub-assembly.
- INSPECT VACUUM HOSES
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 2
- ADD ENGINE OIL
Refer to PROCEDURE - Step 8 [06/2017 - 08/2021] , or refer to PROCEDURE - Step 8 [08/2021 - ]
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 2
- ADD AUTOMATIC TRANSAXLE FLUID
Refer to ADJUSTMENT [09/2019 - ]
- CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT
Refer to PROCEDURE - Step 2
- WARM UP ENGINE
Refer to PROCEDURE - Step 3
- INSPECT SHIFT LEVER POSITION
Refer to PROCEDURE - Step 2
- ADJUST SHIFT LEVER POSITION
Refer to PROCEDURE - Step 3
- INSPECT FOR ENGINE OIL LEAK
Refer to PROCEDURE - Step 9 [06/2017 - 08/2021] , or refer to PROCEDURE - Step 9 [08/2021 - ]
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 3
- INSPECT FOR REFRIGERANT LEAK
Refer to PROCEDURE - Step 4
- INSPECT FOR FUEL LEAK
Refer to PROCEDURE - Step 1
- INSPECT FOR EXHAUST GAS LEAK
Refer to PROCEDURE - Step 14
- CHECK ENGINE OIL LEVEL
Refer to PROCEDURE - Step 1 [06/2017 - 08/2023] , or refer to PROCEDURE - Step 1 [08/2023 - ]
- INSPECT ENGINE COOLANT LEVEL IN RESERVOIR TANK
Refer to PROCEDURE - Step 2
- INSTALL FRONT LOWER BUMPER ABSORBER
- Engage the 2 claws to the front lower bumper absorber.
- Install the 4 bolts.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- INSTALL FRONT BUMPER COVER
Refer to INSTALLATION [10/2020 - ]
- INSTALL FRONT FENDER APRON SEAL LH
- Install the front fender apron seal LH with the 2 screws and clip.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Install the front fender apron seal LH with the 2 screws and clip.
- INSTALL FRONT FENDER APRON SEAL RH
- Install the front fender apron seal RH with the 2 screws and clip.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Install the front fender apron seal RH with the 2 screws and clip.
- INSTALL REAR ENGINE UNDER COVER RH
- Install the rear engine under cover RH with the 2 screws and 3 clips.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Install the rear engine under cover RH with the 2 screws and 3 clips.
- INSTALL REAR ENGINE UNDER COVER LH
- Install the rear engine under cover LH with the 2 screws and 3 clips.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Install the rear engine under cover LH with the 2 screws and 3 clips.
- INSTALL NO. 1 ENGINE UNDER COVER
- Install the No. 1 engine under cover with the bolt, 6 screws and 2 clips.
Bolt
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Install the No. 1 engine under cover with the bolt, 6 screws and 2 clips.
- INSTALL FRONT WHEEL OPENING EXTENSION PAD LH
- Install the front wheel opening extension pad LH with the 3 screws.
- INSTALL FRONT WHEEL OPENING EXTENSION PAD RH
- Install the front wheel opening extension pad RH with the 3 screws.
- INSTALL FRONT WHEELS
Refer to PROCEDURE - Step 1
- ALIGN FRONT WHEELS FACING STRAIGHT AHEAD
Refer to PROCEDURE - Step 8
- INSPECT AND ADJUST FRONT WHEEL ALIGNMENT
Refer to ADJUSTMENT [10/2020 - ]
- PERFORM INITIALIZATION
Refer to PROCEDURE - Step 6
- INSPECT IGNITION TIMING
Refer to PROCEDURE - Step 9
- INSPECT ENGINE IDLE SPEED
Refer to PROCEDURE - Step 10
- INSPECT CO/HC
Refer to PROCEDURE - Step 12
- CHECK FOR SPEED SENSOR SIGNAL
Refer to TEST MODE PROCEDURE [10/2020 - 08/2021] , or refer to TEST MODE PROCEDURE [08/2021 - ]