Installation [06/2017 - ]: Procedure
WARNING: This page is about a different variant/trim than selected.
- INSTALL STARTER ASSEMBLY
- Install the starter assembly with the 2 bolts.
Torque: 46 N*m (469 kgf*cm, 34 ft.*lbf)
- Connect the engine wire to the terminal 30 with the nut.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Close the terminal cap.
- Connect the starter assembly connector.
- Install the starter assembly with the 2 bolts.
- INSTALL BATTERY CLAMP SUB-ASSEMBLY
Refer to PROCEDURE - Step 40 [06/2017 - 10/2020] , or refer to PROCEDURE - Step 40 [10/2020 - ]
- INSTALL ECM
Refer to PROCEDURE - Step 3
- INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
Refer to PROCEDURE - Step 44 [06/2017 - 10/2020] , or refer to PROCEDURE - Step 44 [10/2020 - ]
- INSTALL INLET AIR CLEANER ASSEMBLY
Refer to PROCEDURE - Step 45 [06/2017 - 10/2020] , or refer to PROCEDURE - Step 45 [10/2020 - ]
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 46 [06/2017 - 10/2020] , or refer to PROCEDURE - Step 46 [10/2020 - ]
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 2 [06/2017 - 10/2020] , or refer to PROCEDURE - Step 2 [10/2020 - ]
- INSTALL BATTERY
Refer to INSTALLATION [06/2017 - ]