Installation [08/2015 - ]: Procedure
- INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH
- Install the front No. 1 engine mounting bracket RH with the 4 bolts.
Torque: 43 N.m (438 kgf/cm, 32 ft.lbf)
- Install the front No. 1 engine mounting bracket RH with the 4 bolts.
- INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH
- Install the front No. 1 engine mounting bracket LH with the 3 bolts.
Torque: 43 N.m (438 kgf/cm, 32 ft.lbf)
- Install the front No. 1 engine mounting bracket LH with the 3 bolts.
- INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
Refer to PROCEDURE - Step 19
- INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
Refer to PROCEDURE - Step 14
- INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
Refer to PROCEDURE - Step 6
- INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY
Refer to PROCEDURE - Step 16
- INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 18
- INSTALL INTAKE MANIFOLD
Refer to PROCEDURE - Step 1
- INSTALL FUEL INJECTOR ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL FUEL PIPE SUB-ASSEMBLY
- Install the fuel pipe with the 2 bolts.
Torque: 9.0 N.m (92 kgf/cm, 80 in.lbf)
- Connect the 2 fuel pipes (Refer to PRECAUTION [08/2015 - ] ).
- Install the fuel pipe with the 2 bolts.
- INSTALL REAR CYLINDER HEAD COVER
Refer to PROCEDURE - Step 5
- INSTALL IGNITION COIL ASSEMBLY
- Install the 6 ignition coils with the 6 bolts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Install the 6 ignition coils with the 6 bolts.
- INSTALL NO. 2 EMISSION CONTROL VALVE SET
- Install the No. 2 emission control valve set with the 3 nuts.
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
- Install the No. 2 emission control valve set with the 3 nuts.
- INSTALL NO. 1 EMISSION CONTROL VALVE SET
- Install the No. 1 emission control valve set with the 3 nuts.
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
- Install the No. 1 emission control valve set with the 3 nuts.
- INSTALL HEATER WATER HOSE ASSEMBLY
- Install the heater water hose assembly and connect the 2 hoses.
- INSTALL ENGINE WIRE