Instrument Panel Tie Bar Replacement (SKY)
| Callout | Component Name |
|---|---|
|
Preliminary Procedures
|
|
| 1 | I/P Tie Bar Bolt (Qty: 4)
CAUTION:
Refer to Fastener Caution
.
Tighten: 25 N.m (18 lb ft) |
| 2 | I/P Tie Bar Bolt (Qty: 2) Tighten: 58 N.m (34 lb ft) |
| 3 | I/P Tie Bar Assembly Procedure: With the aid of an assistant, remove the tie bar from the vehicle. |