Installation Procedure
- Install the shift control linkage (2) to the vehicle.
- Install the manual shift shaft nut (1) and tighten to 9 N.m (80 lb in).
- Connect the shift control linkage rod (2) to the shift control assembly (1).
- Adjust the shift control linkage. Refer to Shift Control Linkage Adjustment .
- Install the front closeout panel. Refer to Floor Panel Tunnel Panel Replacement - Front (Automatic Transmission) or Floor Panel Tunnel Panel Replacement - Front (Manual Transmission) .
- Lower the vehicle.
CAUTION:
Refer to Fastener Caution
.