LEMON Manuals: Even more car manuals for everyone
Home >> Pontiac >> 2009 >> Solstice Base, 2D Convertible, Automatic >> Repair and Diagnosis >> Transmission >> Hydraulic Diagrams >> Automatic Transmission - 5L40-E - Removal & Installation, Service, Overhaul, Troubleshooting & Diagnosis >> Repair Instructions - On Vehicle >> Shift Control Linkage Replacement >> Installation Procedure

Installation Procedure

    Fig 1: Identifying Shift Control Linkage & Manual Shift Shaft Nut
    GM1612916Courtesy of GENERAL MOTORS CORP.
  1. Install the shift control linkage (2) to the vehicle.
  2. CAUTION: Refer to Fastener Caution .
  3. Install the manual shift shaft nut (1) and tighten to 9 N.m (80 lb in).
  4. Fig 2: Identifying Shift Control Assembly & Linkage
    GM1612912Courtesy of GENERAL MOTORS CORP.
  5. Connect the shift control linkage rod (2) to the shift control assembly (1).
  6. Adjust the shift control linkage. Refer to Shift Control Linkage Adjustment .
  7. Install the front closeout panel. Refer to Floor Panel Tunnel Panel Replacement - Front (Automatic Transmission) or Floor Panel Tunnel Panel Replacement - Front (Manual Transmission) .
  8. Lower the vehicle.