LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2021 >> NV2500 HD S >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (Engine Mechanical (5.6L)) >> Removal And Installation >> Cylinder Head >> Removal and Installation >> Removal

Removal and Installation: Removal

WARNING: This page is about a different variant/trim than selected.
  1. Remove the following parts:
  2. Disconnect water bypass hose (bank 1) and water bypass hose (bank 2) from cylinder heads.
  3. Disconnect engine coolant temperature sensor 1 harness connector on rear of cylinder head (bank 2).
  4. Disconnect knock sensors harness connectors from cylinder head (bank 1) and cylinder head (bank 2).
  5. Remove cylinder head.
    • Loosen bolts in the reverse of the sequence as shown.
      Fig 1: Cylinder Head Tightening Sequence
      GNSJPBIA2145Z-145Courtesy of NISSAN NORTH AMERICA, INC.

      (A)

      : Bank 2

      (B)

      : Bank 1

      SYMBOL

      : Engine front

  6. Remove cylinder head gaskets.
    CAUTION: Do not reuse gaskets.
  7. Remove the following from cylinder heads (if necessary):
    • Oil filter (for VVEL ladder assembly)
    • Engine coolant temperature sensor 1
  8. Remove valve lifter (if necessary).
    • Identify installation positions, and store them without mixing them up.