Installation [03/2022 - ]: Procedure

WARNING: This page is about a different car, the 2025 Lexus NX 250, 2024 Lexus NX 250, 2023 Lexus NX 250, and 2022 Lexus NX 250. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL CYLINDER HEAD GASKET 
    1. GTY1075975Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Lot No. - -
      Front of Engine - -
      1. Clean the cylinder block sub-assembly and cylinder head sub-assembly with solvent.
      2. Place a new cylinder head gasket on the cylinder block sub-assembly as shown in the illustration.
        NOTE:
        • Make sure that the cylinder head gasket is installed in the correct orientation.
        • Remove any oil from the contact surfaces.
  2. INSTALL CYLINDER HEAD SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 19
  3. INSTALL VALVE STEM CAP 
    Refer to PROCEDURE - Step 26
  4. INSTALL VALVE LASH ADJUSTER ASSEMBLY 
    Refer to PROCEDURE - Step 27
  5. INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 28
  6. INSTALL NO. 2 CAMSHAFT 
    Refer to PROCEDURE - Step 23
  7. INSTALL CAMSHAFT 
    Refer to PROCEDURE - Step 24
  8. INSTALL CAMSHAFT BEARING CAP 
    Refer to PROCEDURE - Step 25
  9. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 29
  10. INSTALL FUEL PUMP LIFTER GUIDE 
    Refer to PROCEDURE - Step 30
  11. INSTALL TIMING CHAIN COVER ASSEMBLY 
    Refer to PROCEDURE - Step 33
  12. INSTALL CAMSHAFT TIMING EXHAUST GEAR ASSEMBLY 
    Refer to PROCEDURE - Step 34
  13. SET NO. 1 CYLINDER TO TDC (COMPRESSION) 
    Refer to PROCEDURE - Step 35
  14. INSTALL NO. 1 CHAIN VIBRATION DAMPER 

    Refer to PROCEDURE - Step 36

  15. INSTALL CHAIN TENSIONER SLIPPER 

    Refer to PROCEDURE - Step 37

  16. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY 
    Refer to PROCEDURE - Step 38
  17. INSTALL CHAIN SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 39
  18. INSTALL CAMSHAFT TIMING GEAR ASSEMBLY 
    Refer to PROCEDURE - Step 40
  19. INSTALL OIL PUMP DRIVE CHAIN SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 41
  20. SET NO. 1 CYLINDER TO TDC (COMPRESSION) 
    Refer to PROCEDURE - Step 42
  21. INSTALL NO. 2 TIMING CHAIN COVER ASSEMBLY 
    Refer to PROCEDURE - Step 43
  22. INSTALL TIMING CHAIN COVER OIL SEAL 
    Refer to PROCEDURE - Step 45
  23. INSTALL SPARK PLUG TUBE GASKET 
    Refer to PROCEDURE - Step 46
  24. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 47
  25. INSTALL WATER OUTLET PIPE GASKET 
  26. INSTALL WATER BY-PASS OUTLET 
    Refer to PROCEDURE - Step 49
  27. INSTALL WATER OUTLET GASKET 
  28. INSTALL WATER OUTLET 
    Refer to PROCEDURE - Step 51
  29. INSTALL CRANKSHAFT PULLEY ASSEMBLY 
    Refer to PROCEDURE - Step 52
  30. CONNECT NO. 2 WATER BY-PASS HOSE 
  31. CONNECT NO. 1 WATER BY-PASS HOSE 
  32. INSTALL NO. 1 VACUUM PUMP O RING 
    Refer to PROCEDURE - Step 1
  33. INSTALL VACUUM PUMP ASSEMBLY 
    Refer to PROCEDURE - Step 2
  34. INSTALL CAM TIMING CONTROL MOTOR O-RING 
    Refer to PROCEDURE - Step 1
  35. INSTALL CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY 
    Refer to PROCEDURE - Step 2
  36. INSTALL CAM TIMING OIL CONTROL SOLENOID O-RING 
    Refer to PROCEDURE - Step 1
  37. INSTALL CAM TIMING OIL CONTROL SOLENOID ASSEMBLY 
    Refer to PROCEDURE - Step 2
  38. INSTALL TIMING GEAR COVER INSULATOR 
    Refer to PROCEDURE - Step 70
  39. INSTALL OIL PRESSURE CONTROL VALVE ASSEMBLY 
    Refer to PROCEDURE - Step 1
  40. INSTALL PURGE VALVE (PURGE VSV) 

    Refer to PROCEDURE - Step 1

  41. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE 
    Refer to PROCEDURE - Step 6
  42. INSTALL IGNITION COIL ASSEMBLY 
    Refer to PROCEDURE - Step 2
  43. INSTALL FUEL INJECTOR SEAL 
    Refer to PROCEDURE - Step 1
  44. INSTALL INJECTOR VIBRATION INSULATOR 
    Refer to PROCEDURE - Step 2
  45. INSTALL C-RING 
    Refer to PROCEDURE - Step 3
  46. INSTALL NO. 1 FUEL INJECTOR BACK-UP RING 
    Refer to PROCEDURE - Step 4
  47. INSTALL NO. 3 FUEL INJECTOR BACK-UP RING 
    Refer to PROCEDURE - Step 5
  48. INSTALL NOZZLE HOLDER CLAMP 
  49. INSTALL DIRECT FUEL INJECTOR ASSEMBLY 
    Refer to PROCEDURE - Step 7
  50. INSTALL FUEL DELIVERY PIPE 
    Refer to PROCEDURE - Step 8
  51. CONNECT WIRE HARNESS 
  52. INSTALL PORT FUEL INJECTOR ASSEMBLY 
    Refer to PROCEDURE - Step 1
  53. INSTALL NO. 5 ENGINE WIRE 
  54. INSTALL INJECTOR VIBRATION INSULATOR 
  55. INSTALL NO. 1 DELIVERY PIPE SPACER 
  56. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 5
  57. INSTALL NO. 7 WATER BY-PASS HOSE 
  58. INSTALL FUEL PUMP LIFTER ASSEMBLY 
    Refer to PROCEDURE - Step 1
  59. INSTALL FUEL PUMP SPACER GASKET 
  60. TEMPORARILY INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY 
    Refer to PROCEDURE - Step 3
  61. TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 4
  62. INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY 
    Refer to PROCEDURE - Step 5
  63. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 6
  64. CONNECT FUEL TUBE SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 7
  65. INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET 
  66. INSTALL INTAKE MANIFOLD 
    Refer to PROCEDURE - Step 4
  67. INSTALL NO. 2 WATER BY-PASS PIPE 
    Refer to PROCEDURE - Step 6
  68. INSTALL NO. 3 WATER BY-PASS PIPE 
    Refer to PROCEDURE - Step 7
  69. SET EGR VALVE ASSEMBLY 
    Refer to PROCEDURE - Step 9
  70. INSTALL NO. 4 WATER BY-PASS HOSE 
  71. INSTALL NO. 1 EGR COOLER GASKET 
    Refer to PROCEDURE - Step 3
  72. INSTALL EGR VALVE GASKET 
    Refer to PROCEDURE - Step 4
  73. INSTALL EGR COOLER ASSEMBLY 
    Refer to PROCEDURE - Step 5
  74. CONNECT NO. 4 WATER BY-PASS HOSE 
  75. CONNECT NO. 3 WATER BY-PASS HOSE 
  76. INSTALL EGR VALVE ASSEMBLY 
    Refer to PROCEDURE - Step 9
  77. INSTALL EGR INLET GASKET 
  78. INSTALL EGR VALVE ADAPTER GASKET 
  79. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 12
  80. INSTALL THROTTLE BODY GASKET 
    Refer to PROCEDURE - Step 1
  81. CONNECT NO. 5 WATER BY-PASS HOSE 
    Refer to PROCEDURE - Step 2
  82. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY 
    Refer to PROCEDURE - Step 3
  83. CONNECT NO. 6 WATER BY-PASS HOSE 
    Refer to PROCEDURE - Step 4
  84. INSTALL EXHAUST MANIFOLD TO HEAD GASKET 
  85. INSTALL EXHAUST MANIFOLD (TWC: Front Catalyst) 
    Refer to PROCEDURE - Step 3
  86. INSTALL MANIFOLD STAY 
    Refer to PROCEDURE - Step 4
  87. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR 

    Refer to PROCEDURE - Step 6

  88. INSTALL NO. 2 WATER HOSE CLAMP BRACKET 
  89. INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY) 

    Refer to PROCEDURE - Step 55

  90. INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 56
  91. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY 
    Refer to PROCEDURE - Step 58
  92. INSTALL NO. 2 ENGINE COVER 

    Refer to PROCEDURE - Step 62

  93. INSTALL COMPRESSOR ASSEMBLY WITH PULLEY 
    Refer to PROCEDURE - Step 2
  94. INSTALL GENERATOR ASSEMBLY 

    Refer to PROCEDURE - Step 1

  95. INSTALL V-RIBBED BELT 
    Refer to PROCEDURE - Step 1
  96. INSTALL ENGINE HANGERS 
    See step  4
  97. REMOVE ENGINE ASSEMBLY FROM ENGINE STAND 

    See step  5