LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2020 >> UX 200 Luxury >> Repair and Diagnosis >> External Pages >> Different car >> Section 16 (Engine Mechanical (M20A-FXS) (Service Information) (1 Of 2)) >> Cylinder Head Gasket >> Installation [10/2018 - ] >> Procedure

Installation [10/2018 - ]: Procedure

WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2024 Lexus UX 250h, 2023 Lexus UX 250h, 2022 Lexus UX 250h, 2021 Lexus UX 250h, and 2020 Lexus UX 250h. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL CYLINDER HEAD GASKET 
    1. Clean the cylinder block sub-assembly and cylinder head sub-assembly with solvent.
    2. Place a new cylinder head gasket on the cylinder block sub-assembly with the Lot No. stamp facing upward.
      GTY797241Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Lot No.
      Front of Engine
      NOTE:

      Make sure that the cylinder head gasket is installed in the correct orientation.

  2. INSTALL CYLINDER HEAD SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 17

  3. INSTALL EXHAUST CAMSHAFT SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 23

  4. INSTALL INTAKE CAMSHAFT SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 24

  5. INSTALL CAMSHAFT BEARING CAP 

    Refer to PROCEDURE - Step 25

  6. INSTALL VALVE LASH ADJUSTER ASSEMBLY 

    Refer to PROCEDURE - Step 20

  7. INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 21

  8. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 26

  9. INSTALL FUEL PUMP LIFTER GUIDE 

    Refer to PROCEDURE - Step 27

  10. INSTALL TIMING CHAIN COVER ASSEMBLY 

    Refer to PROCEDURE - Step 30

  11. INSTALL CAMSHAFT TIMING EXHAUST GEAR ASSEMBLY 

    Refer to PROCEDURE - Step 31

  12. SET NO. 1 CYLINDER TO TDC (COMPRESSION) 

    Refer to PROCEDURE - Step 32

  13. INSTALL NO. 1 CHAIN VIBRATION DAMPER 

    Refer to PROCEDURE - Step 33

  14. INSTALL CHAIN TENSIONER SLIPPER 

    Refer to PROCEDURE - Step 34

  15. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY 

    Refer to PROCEDURE - Step 35

  16. INSTALL CHAIN SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 36

  17. INSTALL CAMSHAFT TIMING GEAR ASSEMBLY 

    Refer to PROCEDURE - Step 31

  18. INSTALL OIL PUMP DRIVE CHAIN SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 38

  19. SET NO. 1 CYLINDER TO TDC (COMPRESSION) 

    Refer to PROCEDURE - Step 23

  20. INSTALL NO. 2 TIMING CHAIN COVER ASSEMBLY 

    Refer to PROCEDURE - Step 40

  21. INSTALL TIMING CHAIN COVER OIL SEAL 

    See step  1

  22. INSTALL SPARK PLUG TUBE GASKET 

    Refer to PROCEDURE - Step 43

  23. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 44

  24. INSTALL OUTLET WATER BY-PASS SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 45

  25. INSTALL WATER OUTLET 

    Refer to PROCEDURE - Step 46

  26. INSTALL CRANKSHAFT PULLEY ASSEMBLY 

    Refer to PROCEDURE - Step 47

  27. INSTALL CAM TIMING CONTROL MOTOR O-RING 

    Refer to PROCEDURE - Step 1

  28. INSTALL CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY 

    Refer to PROCEDURE - Step 2

  29. INSTALL CAM TIMING OIL CONTROL SOLENOID ASSEMBLY 

    Refer to PROCEDURE - Step 2

  30. INSTALL OIL PRESSURE CONTROL VALVE ASSEMBLY 

    Refer to PROCEDURE - Step 1

  31. INSTALL DIRECT FUEL INJECTOR ASSEMBLY 

    Refer to PROCEDURE - Step 2

  32. INSTALL IGNITION COIL ASSEMBLY 

    Refer to PROCEDURE - Step 2

  33. INSTALL FUEL INJECTOR SEAL 

    Refer to PROCEDURE - Step 1

  34. INSTALL DIRECT FUEL INJECTOR ASSEMBLY 

    Refer to PROCEDURE - Step 2

  35. INSTALL FUEL DELIVERY PIPE 

    Refer to PROCEDURE - Step 3

  36. INSTALL PORT FUEL INJECTOR ASSEMBLY 

    Refer to PROCEDURE - Step 1

  37. INSTALL NO. 5 ENGINE WIRE 

    Refer to PROCEDURE - Step 2

  38. INSTALL INJECTOR VIBRATION INSULATOR 

    Refer to PROCEDURE - Step 3

  39. INSTALL FUEL DELIVERY SPACER 

    Refer to PROCEDURE - Step 4

  40. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 5

  41. INSTALL WATER BY-PASS HOSE ASSEMBLY 

    Refer to PROCEDURE - Step 17

  42. TEMPORARILY INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY (for High Pressure) 

    Refer to PROCEDURE - Step 1

  43. TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 2

  44. INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY (for High Pressure) 

    Refer to PROCEDURE - Step 3

  45. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 21

  46. CONNECT FUEL TUBE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 22

  47. INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET 

    Refer to PROCEDURE - Step 2

  48. INSTALL INTAKE MANIFOLD 

    Refer to PROCEDURE - Step 3

  49. INSTALL INTAKE MANIFOLD STAY 

    Refer to PROCEDURE - Step 4

  50. INSTALL NO. 3 WATER BY-PASS PIPE 

    Refer to PROCEDURE - Step 26

  51. INSTALL EGR VALVE ASSEMBLY 

    Refer to PROCEDURE - Step 3

  52. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 4

  53. INSTALL EGR COOLER ASSEMBLY 

    Refer to PROCEDURE - Step 1

  54. INSTALL THROTTLE BODY GASKET 

    Refer to PROCEDURE - Step 1

  55. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY 

    Refer to PROCEDURE - Step 2

  56. INSTALL EXHAUST MANIFOLD (TWC: Front Catalyst) 

    Refer to PROCEDURE - Step 2

  57. INSTALL MANIFOLD STAY 

    Refer to PROCEDURE - Step 3

  58. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR 

    Refer to PROCEDURE - Step 4

  59. INSTALL WATER SEAL PLATE 

    Refer to PROCEDURE - Step 18

  60. INSTALL FUEL HOSE BRACKET 

    Refer to PROCEDURE - Step 35

  61. INSTALL ENGINE HANGERS 

    See step [10/2018 - 07/2022] 48, or see step [07/2022 -] 47

  62. REMOVE ENGINE ASSEMBLY FROM ENGINE STAND 

    Refer to INSTALLATION [10/2018 - 07/2022] , or refer to INSTALLATION [07/2022 - ]