Adjustment [04/2013 - 08/2015]: Procedure
- REMOVE FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst)
- for 2GR-FSE:
Refer to REMOVAL [04/2013 - 10/2016]
- for 4GR-FSE:
Refer to REMOVAL [04/2013 - 08/2015]
- for 2GR-FSE:
- REMOVE FRONT NO. 1 FLOOR HEAT INSULATOR
- for 2GR-FSE:
Refer to PROCEDURE - Step 2
- for 4GR-FSE:
Refer to PROCEDURE - Step 2
- for 2GR-FSE:
- ADJUST SHIFT LEVER POSITION
- Move the shift lever to N.
- Remove the nut and separate the floor shift gear shifting rod sub-assembly from the lever of the transmission floor shift assembly.
*a Lever - Turn the transmission control shaft lever LH clockwise until it stops, then turn it counterclockwise 2 notches.
*1 Transmission Control Shaft Lever LH *a P *b R *c N - Temporarily install the floor shift gear shifting rod sub-assembly to the lever of the transmission floor shift assembly with the nut.
*a Lever Pushing the lever rearward - Tighten the nut while lightly pushing the lever of the transmission floor shift assembly rearward.
Torque: 12.8 N.m (131 kgf/cm, 9 ft.lbf)
NOTE:Do not push the lever of the transmission floor shift assembly too hard.
- INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR
- for 2GR-FSE:
Refer to PROCEDURE - Step 4
- for 4GR-FSE:
Refer to PROCEDURE - Step 4
- for 2GR-FSE:
- INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst)
- for 2GR-FSE:
Refer to INSTALLATION [04/2013 - 10/2016]
- for 4GR-FSE:
Refer to INSTALLATION [04/2013 - 08/2015]
- for 2GR-FSE:
- INSPECT SHIFT LEVER POSITION
See step 1
- INSPECT FOR EXHAUST GAS LEAK
- for 2GR-FSE:
Refer to PROCEDURE - Step 14
- for 4GR-FSE:
Refer to PROCEDURE - Step 14
- for 2GR-FSE: