Installation Procedure
- Install the J 41798
.
Tighten:
- Tighten the M8 engine lift bracket bolts to 25 N.m (18 lb ft).
- Tighten the M10 engine lift bracket bolts to 50 N.m (37 lb ft).
- Position and install the engine hoist to the J 41798 .
- Remove the engine from the engine stand.
- Remove the J 21366 .
- Install the engine to the vehicle.
- Align and install the engine to the transmission. Raise or lower the transmission as required using the floor jack.
- Once aligned and mated together completely lower and remove the engine hoist.
- Install the left and right engine mount to frame bolts (1).
Tighten: Tighten the bolts to 65 N.m (48 lb ft) starting with the middle bolt then either side bolt.
- Remove the floor jack from under the transmission.
- Raise the vehicle.
- Install the transmission bolts/studs (1).
Tighten: Tighten the bolts/studs to 50 N.m (37 lb ft).
- Install the fuel/EVAP pipe bracket to the stud.
- Install the fuel/evaporative emission (EVAP) pipe bracket nut to the transmission stud.
Tighten: Tighten the nut to 18 N.m (13 lb ft).
- Install the fluid filler tube bracket to the transmission.
- Install the fluid filler tube retaining nut (2).
Tighten: Tighten the nut to 18 N.m (13 lb ft).
- Align the torque dampener bolt holes to the flywheel bolt holes.
- With the aid of an assistant, hold the crank pulley, then install the flywheel to torque dampener bolts.
Tighten: Tighten the bolts to 65 N.m (48 lb ft).
- Install the right flex plate inspection cover (1).
- Install the right flex plate inspection cover bolt (2).
Tighten: Tighten the bolt to 12 N.m (106 lb in).
- Install the catalytic converter. Refer to Catalytic Converter Replacement (LFA) .
- Lower the vehicle.
- Remove the J 41798 .
- Install the 3 phase cable bracket to the right cylinder head.
- Install the ignition coil(s) and spark plug wire(s), as required. Refer to Ignition Coil Replacement .
- Raise the vehicle.
- Connect the coolant heater cord to the coolant heater, if equipped.
- Connect the engine harness electrical connector (1) to the CKP sensor.
- Connect the engine harness electrical connector (2) to the knock sensor.
- Connect the engine harness electrical connector (3) to the oil level sensor.
- Connect the engine harness electrical connector (2) to the A/C refrigerant pressure sensor.
- Connect the auxiliary heater water pump electrical connector (1).
- Connect the engine harness electrical connector (1) to the CMP sensor wire harness.
- Connect the engine harness electrical connector (4) to the knock sensor.
- Position the engine harness grounds (3) to the engine block.
- Install the engine harness ground stud (2) to the engine block.
Tighten: Tighten the stud to 16 N.m (12 lb ft).
- Install the engine harness clip (1) to the ground stud.
- Lower the vehicle.
- Position the engine ground wire to the right cylinder head.
- Install the engine harness stud (1) to the right cylinder head.
Tighten: Tighten the stud to 25 N.m (18 lb ft).
- Position the engine ground strap to the cylinder head and cowl.
- Install the engine ground strap bolt to the rear of the left cylinder head and cowl.
Tighten: Tighten the bolt to 16 N.m (12 lb ft).
- Install the engine bracket (3) to the ignition coil bracket stud and install nut (1).
Tighten: Tighten the nut to 12 N.m (106 lb in).
- Raise the vehicle half way.
- Working through the wheel opening, install the engine bracket bolts (2).
Tighten: Tighten the bolts to 50 N.m (37 lb ft).
- Install the right wheelhouse liner. Refer to Front Wheelhouse Liner Replacement - Right Side .
- Position the generator control module 3 phase cables to the bracket channel.
- Install the generator control module 3 phase cable clip to the tab (3) on the engine bracket (2).
- Install the generator control module 3 phase cable clip nut (1).
Tighten: Tighten the nut to 9 N.m (80 lb in).
- Connect the engine harness electrical connector (1) to the oil pressure sensor.
- Connect the engine harness electrical connector (2) to the lifter oil manifold.
- Install the heater hoses. Refer to Heater Inlet Hose Replacement (Pump to Heater Core-HP2) or Heater Inlet Hose Replacement (Pump to Engine-HP2) and Heater Outlet Hose Replacement .
- Install the radiator outlet hose to the water pump.
- Position the radiator outlet hose clamp (1) at the water pump.
- Install the radiator inlet hose to the water pump.
- Position the radiator inlet hose clamp (3) at the water pump.
- Position and install the radiator vent inlet hose (2) to the air bleed pipe.
- Position the radiator vent inlet hose clamp (1) at the air bleed pipe.
- Install the radiator vent inlet hose (2) to the radiator inlet hose clip (3).
- Position the generator battery jumper to the engine.
- Install the intake manifold. Refer to Intake Manifold Replacement .
- Connect the cables from the generator control module.
- Connect the A/C pressure sensor electrical connector.
- Connect the A/C lines from the A/C compressor. Refer to Discharge Hose Replacement (HP2) and Suction Hose Replacement (W/C69-HP2) or Suction Hose Replacement (W/O C69-HP2) .
- For 2500 series vehicles, install the oil pan skid plate and bolts, if equipped.
Tighten: Tighten the bolts to 28 N.m (21 lb ft).
- For 1500 series vehicles, install the oil pan skid plate and bolts, if equipped.
Tighten: Tighten the bolts to 28 N.m (21 lb ft).
- Lower the vehicle.
- Install the front end upper tie bar. Refer to Front End Upper Tie Bar Replacement .
- Install the hood latch. Refer to Hood Primary and Secondary Latch Replacement .
- With the aid of the assistant raise the hood slightly until the hood hinge bolts can be removed from the service position notch (1).
- With the aid of an assistant lower the hood and install the hood hinge bolts (3) to the hood hinges.
Tighten: Tighten the bolts to 25 N.m (18 lb ft).
- Install the hood strut rod (1) to the hood strut bracket stud.
- Install the air inlet grille end caps (2), push down the end cap in order to engage the retainers.
- Install the ground strap to the hood stud.
- Install the ground strap nut at the hood stud.
Tighten: Tighten the nut to 9 N.m (80 lb in).
- Refill the cooling system. Refer to Cooling System Draining and Filling (Static Fill) .
- Prelube the engine. Refer to Engine Prelubing .
- Enable the high voltage system. Refer to High Voltage Enabling .
- Perform the CKP system variation learn procedure. Refer to Crankshaft Position System Variation Learn .
- Use the following procedure after the engine is installed in the vehicle:
- Disable the ignition system.
- Crank the engine several times. Listen for any unusual noises or evidence that parts are binding.
- Enable the ignition system.
- Start the engine and listen for unusual noises.
- Check the vehicle oil pressure gage or light and confirm that the engine has acceptable oil pressure.
- Run the engine speed at about 1,000 RPM until the engine has reached normal operating temperature.
- Listen for sticking lifters or other unusual noises.
- Inspect for fuel, oil and/or coolant leaks while the engine is running.
- Perform a final inspection for the proper oil and coolant levels.