Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Install a NEW turbocharger heat shield with gasket (1).
- Install Turbocharger (2)
- Raise the vehicle.
- Install and hand tighten the 4 NEW turbocharger nuts (1).
- Turbocharger Nut (1) - Tighten in sequence [4x] - Turbocharger Installation
- Install a NEW Turbocharger Oil Return Pipe Gasket (3).
- Position the pipe (2) then install the turbocharger oil return pipe bolts (1). Turbocharger Oil Return Pipe Replacement
- Lower the vehicle.
- Connect the turbocharger wastegate regulator solenoid valve electrical connector (2).
- Connect Electrical Connector (3) @Turbocharger Bypass Valve Solenoid (1)
- Install Turbocharger Coolant Feed Pipe - Turbocharger Coolant Feed Pipe Replacement (LYX)
- Install Turbocharger Coolant Return Pipe - Turbocharger Coolant Return Pipe Replacement (LYX)
- Install Turbocharger Oil Feed Pipe (2) - Turbocharger Oil Feed Pipe Replacement
- Install Warm Up Three-Way Catalytic Converter - Warm Up Three-Way Catalytic Converter Replacement (LYX)
- Connect Positive Crankcase Ventilation Tube with Positive Crankcase Ventilation Valve - Foul Air (2) @Turbocharger -Positive Crankcase Ventilation Tube Replacement (Fresh Air) Positive Crankcase Ventilation Tube Replacement (Foul Air)
- Install Charge Air Cooler Inlet Hose - Charge Air Cooler Inlet Air Tube Replacement
- Install Turbocharger Heat Shield - Turbocharger Heat Shield Replacement
- Connect Air Cleaner Outlet Duct@Turbocharger -Air Cleaner Outlet Duct Replacement
- Connect Air Cleaner Outlet Duct@Air Cleaner Assembly - Air Cleaner Outlet Duct Replacement
- Connect the battery negative cable. Battery Negative Cable Disconnection and Connection (KL9)
- Perform the Intake System Learned Values Reset. Intake System Learned Values Reset
CAUTION:
Refer to Torque-to-Yield Fastener Caution .