ACR2000 (GE-48800) A/C System Procedure
Flushing with the ACR 2000 is not intended to remove metal from the A/C system.
Flushing is intended to remove the following contaminants:
- Contaminated polyolester (POE) oil
- Desiccant, following a desiccant bag failure
- Overcharge of POE oil
- Refrigerant contamination
- Recover the refrigerant. Refrigerant Recovery and Recharging (R-1234yf)
- Remove the air conditioning receiver and dehydrator. Receiver and Dehydrator Replacement
- Remove the air conditioning refrigerant desiccant plug from the desiccant cartridge.
- Install the air conditioning refrigerant desiccant plug without the desiccant cartridge.
- Remove the evaporator thermal expansion valve. Air Conditioning Evaporator Thermal Expansion Valve Replacement
- Install GE-45268-115 to the evaporator.
- Remove the drive motor battery cooler thermal expansion valve. Air Conditioning Evaporator Thermal Expansion Valve Replacement
- Install another GE-45268-115 to the drive motor battery cooler.
- Install A/C evaporator tube to both GE-45268-115.
- Install A/C evaporator TXV tube to both GE-45268-115 using an oversized seal washer.
- Remove the A/C and drive motor battery cooling compressor. Air Conditioning with Motor Compressor Replacement (LKN)
- Inspect the end of the suction hose for a suction screen.
- Remove the suction screen, if installed.
- Install GE-45268-4 to the A/C compressor suction hose.
- Install GE-452688-5 to the A/C compressor discharge hose.
Forward flow refrigerant flushing is recommended for contaminated refrigerant or POE oil.
- Perform the following procedure:
- Service the filter with ACDelco P/N GF 470, before each flush.
Connect the GE-45268-1 flush filter to the suction port of the GE-45268-4 flush adapter.
- Connect the blue hose from the GE-48800 ACR 2000 Air Conditioning Service Center to the J 45268-1 flush filter adapter.
- Connect the red hose from the GE-48800 ACR 2000 Air Conditioning Service Center to the GE-45268-5 flush adapter.
NOTE:The filter inside the GE-45268-1 is serviceable. Remove and discard the check valve from the filter.
- Service the filter with ACDelco P/N GF 470, before each flush.
- Reverse flow refrigerant flushing is recommended for desiccant cartridge failure.
- Service the filter with AC P/N GF 470, before each flush. Connect the J 45268-1 flush filter to the discharge port of the GE-45268-5 flush adapter.
- Connect the blue hose from the GE-48800 ACR 2000 Air Conditioning Service Center to the J 45268-1 flush filter adapter.
- Connect the red hose from the GE-48800 ACR 2000 Air Conditioning Service Center to the suction port of the GE-45268-4 flush adapter.
NOTE:The filter inside the J 45268-1 is serviceable. Remove and discard the check valve from the filter.
- Flush the front A/C system. Follow the instructions supplied with the GE-48800 ACR 2000 Air Conditioning Service Center.
- Flush the A/C system. Follow the instructions supplied with the GE-48800 ACR 2000 Air Conditioning Service Center
- Remove the GE-45268-4 from the A/C compressor suction hose.
- Remove the GE-45268-5 from the A/C compressor discharge hose.
- If the removed A/C compressor is being reinstalled, perform the following procedure:
- Drain the POE oil from the A/C compressor.
- Add the total system capacity of POE oil to the A/C compressor. Approximate Fluid Capacities
- If you will replace the A/C compressor after flushing the system, perform the following procedure:
- Refer to the Approximate Fluid Capacities
- DO NOT drain the new POE oil from the compressor.
- Deduct the amount of POE oil shipped with the service compressor from the amount of POE oil listed in the capacities table. Approximate Fluid Capacities
- Add the calculated amount to the compressor, as needed.
- Install the air conditioning and drive motor battery cooling compressor. Air Conditioning with Motor Compressor Replacement (LKN)
- Replace the air conditioning receiver and dehydrator. Receiver and Dehydrator Replacement
- Remove A/C evaporator TXV tube from both GE-45268-115.
- Remove A/C evaporator tube from both GE-45268-115.
- Remove both GE-45268-115.
- Install the drive motor battery cooler thermal expansion valve. Air Conditioning Evaporator Thermal Expansion Valve Replacement
- Install the evaporator thermal expansion valve. Air Conditioning Evaporator Thermal Expansion Valve Replacement
- Evacuate and recharge the A/C system. Refrigerant Recovery and Recharging (R-1234yf)
- Leak test the fittings using GE-42220 Universal 12V Leak Detection Lamp
Warmer engine or ambient temperature decreases the refrigerant recovery time during the A/C flush procedure.
Close the valve on the external refrigerant tank, before starting the flush process.
Close the valve on the external refrigerant tank, before starting the flush process.
Flushing will remove all the POE oil from the A/C system.
The A/C system must be replenished with the correct amount of POE oil.
Flushing will remove the fluorescent leak detection dye from the A/C system.
The air conditioning refrigerant desiccant is manufactured with POE fluorescent leak detection dye wafer inside.