Installation Procedure
WARNING: This page is about a different car, the 2009 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
- Route the positive battery cable as noted in the removal.
- Route the cable through the dash panel reinforcement to under the hood.
- Install the positive battery cable from the retainers (2 and 4).
- Install the push retainers (1 and 3) into the hybrid control module tray.
- Route the cables (2 and 5) to the terminals.
- Install the fused cable (3) to the terminal.
- Install the terminal fasteners (1, and 4) and tighten to 10 N.m (89 lb in)..
- Install the under hood fuse box and junction block covers.
- Install the positive cable grommet (3) into the dash panel reinforcement.
- From under the dash, attach the retainers (1 and 2).
- Install the positive battery cable into the retainers (1, 2, 3, and 4).
- Install the positive battery cable into the retainers (1, 2, and 3).
- Position the positive battery cable terminal (2) to the battery.
- Rotate the positive cable terminal lever (1) to the locked position.
- Connect the current sensor harness connector (1).
- Install the fuel injection sight shield. Refer to Fuel Injector Sight Shield Replacement (LY7) or Fuel Injector Sight Shield Replacement (LCS) .
- Install the drive motor generator power inverter module cover. Refer to Drive Motor Generator Power Inverter Module Cover Replacement .
- Install the center pillar lower garnish molding. Refer to Center Pillar Lower Garnish Molding Replacement .
- Install the quarter lower rear trim panel. Refer to Quarter Lower Rear Trim Panel Replacement .
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (HP5) .
CAUTION:
Refer to Fastener Caution
.