LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 1933 (Hybrid Engine Electrical System 3.6L (Hp5)) >> Repair Instructions >> Battery Positive Cable Replacement >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2009 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
  1. Route the positive battery cable as noted in the removal.
  2. Route the cable through the dash panel reinforcement to under the hood.
  3. Fig 1: Locating Push Retainers
    GM2108734Courtesy of GENERAL MOTORS CORP.
  4. Install the positive battery cable from the retainers (2 and 4).
  5. Install the push retainers (1 and 3) into the hybrid control module tray.
  6. Fig 2: Cables, Terminals & Fasteners
    GM2107984Courtesy of GENERAL MOTORS CORP.
  7. Route the cables (2 and 5) to the terminals.
  8. Install the fused cable (3) to the terminal.
  9. CAUTION: Refer to Fastener Caution .
  10. Install the terminal fasteners (1, and 4) and tighten to 10 N.m (89 lb in)..
  11. Install the under hood fuse box and junction block covers.
  12. Fig 3: Underdash Retainers
    GM2108736Courtesy of GENERAL MOTORS CORP.
  13. Install the positive cable grommet (3) into the dash panel reinforcement.
  14. From under the dash, attach the retainers (1 and 2).
  15. Fig 4: Positive Battery Cable & Retainers
    GM2107981Courtesy of GENERAL MOTORS CORP.
  16. Install the positive battery cable into the retainers (1, 2, 3, and 4).
  17. Fig 5: Positive Battery Cable & Retainers
    GM2107978Courtesy of GENERAL MOTORS CORP.
  18. Install the positive battery cable into the retainers (1, 2, and 3).
  19. Fig 6: Positive Cable Terminal & Lever
    GM2107958Courtesy of GENERAL MOTORS CORP.
  20. Position the positive battery cable terminal (2) to the battery.
  21. Rotate the positive cable terminal lever (1) to the locked position.
  22. Fig 7: Current Sensor Harness Connector
    GM2107973Courtesy of GENERAL MOTORS CORP.
  23. Connect the current sensor harness connector (1).
  24. Install the fuel injection sight shield. Refer to Fuel Injector Sight Shield Replacement (LY7) or Fuel Injector Sight Shield Replacement (LCS) .
  25. Install the drive motor generator power inverter module cover. Refer to Drive Motor Generator Power Inverter Module Cover Replacement .
  26. Install the center pillar lower garnish molding. Refer to Center Pillar Lower Garnish Molding Replacement .
  27. Install the quarter lower rear trim panel. Refer to Quarter Lower Rear Trim Panel Replacement .
  28. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (HP5) .