Installing/replacing the right rail pressure sensor
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2023 BMW M5, 2022 BMW M5, 2021 BMW M5, 2020 BMW M5, and 2019 BMW M5. However, it is still accessible from the selected car via links, so may be relevant.
Precondition
High-pressure rail is removed.
- Replace the rail pressure sensor (2)
.
Parts: Rail pressure sensor
- Screw in the rail pressure sensor (2) in the high-pressure rail and tighten it.
TIGHTENING TORQUES SPECIFICATION
| Rail pressure sensor to rail | ||
| Rail pressure sensor M10 | Tightening torque | 35 Nm |
- Un-clamp the rail on the lug (1) .
Follow-up work
- Refer to INSTALLING RIGHT HIGH PRESSURE PUMP .
- Refer to INSTALLING THE HOLDER WITH THE VEHICLE WIRING HARNESS FOR THE SENSOR SYSTEM OF CYLINDER BANK 1 .
- Refer to INSTALLING RAIL OF CYLINDER BANK 1 .
- Refer to INSTALLING THE IGNITION COILS OF CYLINDERS 1 AND 2 .
- Refer to INSTALLING FAN COWL WITH ELECTRIC MOTOR .
- Refer to INSTALLING THE REAR TOP CROSS CONNECTION .
- Refer to INSTALLING RIGHT INTAKE SILENCER HOUSING .
- Refer to INSTALLING LEFT INTAKE SILENCER HOUSING .
- Refer to INSTALLING FRONT CROSS CONNECTION .
- Refer to TIGHTENING THE LEFT FRONT-END STRUT .
- Refer to TIGHTENING THE FRONT-END STRUT ON THE RIGHT .
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT ON THE RIGHT .
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT ON THE LEFT .
- Installing the cover panel of the master DME control unit.
- Position the cover of the master DME control unit (1)
- Engage the cover panel of the master DME control unit (1) downwards with the clamps (2) and the guide pins (3) in the carrier plate of the DME.
- Refer to INSTALLING THE COVER PANEL OF THE SLAVE DME CONTROL UNIT .