Perform Flushing 2
- Start Flushing 2 on the A/C service station.
- Perform Flushing 2 for at least 30 minutes.
Check
- Once Flushing 2 is complete, check whether the refrigerant in the sight glass on the A/C service station is clean:
Result
» Refrigerant in sight glass is clean.
Measure
- Both flushings are complete.
Result
» Refrigerant in sight glass is not yet clean.
Measure
- Fully repeat Flushing 2.
Follow-up work
- Refer to REMOVING ALL SPECIAL TOOLS .
- Refer to INSTALLING THE EXPANSION VALVE FOR THE HIGH-VOLTAGE BATTERY UNIT ON THE RIGHT .
- Refer to INSTALLING THE EXPANSION VALVE FOR THE HIGH-VOLTAGE BATTERY UNIT .
- Refer to INSTALLING THE UNDERSHIELD (TANK COVER) AT RIGHT .
- Refer to INSTALLING THE LEFT UNDERSHIELD (TANK COVER) .
- Refer to INSTALLING FRONT CONNECTING SUPPORT ON TUNNEL .
- Refer to INSTALLING THE REFRIGERANT SHUTOFF VALVE FOR THE HIGH-VOLTAGE BATTERY .
- Refer to INSTALLING UNDERBODY PROTECTION AT REAR .
- Refer to INSTALLING THE UNDERSHIELD ON THE SIDES .
- Refer to DISCONNECTING REFRIGERANT LINE ON THE CONNECTING PIECE .
- Refer to INSTALL EXPANSION VALVE .
- Refer to CONNECTING THE REFRIGERANT LINE TO THE EXPANSION VALVE .
- Refer to INSTALLING THE HOLDER FOR TENSION RELIEF OF THE CABLES .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to INSTALLING THE ELECTRIC A/C COMPRESSOR (EKK) .
- Refer to SECURING THE REFRIGERANT LINE TO THE CONNECTING PIECE .
- Refer to REMOVING THE LOW-TEMPERATURE COOLANT EXPANSION TANK .
- Refer to INSTALLING THE ENGINE CONTROL UNIT COVER .
- Refer to INSTALLING HOLDER FOR THE COOLANT LINES .
- Refer to INSTALLING THE TENSIONING PULLEY FOR THE COOLANT PUMP .
- Refer to INSTALLING THE DRIVE BELT FOR THE COOLANT PUMP .
- Refer to TIGHTENING BELT PULLEY .
- Refer to INSTALLING CHARGE AIR LINE .
- Refer to INSTALLING THE CLEAN AIR PIPE AND THE RESONATOR .
- Refer to INSTALLING THE INTAKE FILTER HOUSING (TENSION STRUT REMOVED ON SHOCK TOWER) .
- Refer to INSTALLING FAN COWL .
- Refer to INSTALLING THE REAR TOP CROSS CONNECTION .
- Refer to INSTALLING TENSION STRUT ON LEFT AND RIGHT SHOCK TOWER .
- Refer to INSTALLING UPPER CROSS CONNECTION .
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT AT TOP LEFT , and INSTALLING THE COVER IN THE ENGINE COMPARTMENT ON THE TOP RIGHT .
- Refer to INSTALLING AIR CONDITIONING CONDENSER .
- Refer to INSTALLING THE FRONT BOTTOM WHEEL ARCH COVER .
- Refer to INSTALLING FRONT UNDERBODY PROTECTION .
- Refer to INSTALLING THE BRACKET FOR THE DME CONTROL UNIT .
- Refer to INSTALLING THE ENGINE CONTROL UNIT COVER .
- Refer to EVACUATE AND CHARGE CONDITIONING .
- Refer to CONNECTING ALL BATTERY GROUND LEADS .
- Refer to ACTIVATING HIGH-VOLTAGE SYSTEM .
- Refer to INSTALLING FLAP IN RIGHT LUGGAGE COMPARTMENT TRIM PANEL .
- Refer to FILLING AND VENTING THE LOW-TEMPERATURE COOLANT CIRCUIT .