Installing wiring harness section for ignition system of bank 1
- Feed in ground cable and position.
- Tighten nut (1).
TIGHTENING TORQUES SPECIFICATION
| Ground cable to hold-down device | ||
| Nuts | Tightening torque | 5.5 Nm |
- Engage wiring harness section in holders (4).
- Engage wiring harness section with holders (1).
- Tighten screws (2).
TIGHTENING TORQUES SPECIFICATION
| Cable duct | ||
| M6x16 screw | Tightening torque | 10 Nm |
- Tighten nut (3).
TIGHTENING TORQUES SPECIFICATION
| Ground cable to hold-down device | ||
| Nuts | Tightening torque | 5.5 Nm |
Follow-up work
- Refer to ATTACHING CONNECTOR OF THE IGNITION COIL OF CYLINDER BANK 1 .
- Refer to ATTACHING CONNECTOR OF THE INJECTORS OF CYLINDER BANK 1 .
- Refer to INSTALLING (PARTIAL INSTALLATION) THE EXPANSION TANK FOR THE CHARGE AIR COOLERS .
- Refer to INSTALLING CONTROL UNIT HOLDER FOR CYLINDERS 1 TO 4 .
- Refer to INSTALLING ACOUSTIC COVER .
- Installing the cover panel of the master DME control unit.
- Position the cover of the master DME control unit (1)
- Engage the cover panel of the master DME control unit (1) downwards with the clamps (2) and the guide pins (3) in the carrier plate of the DME.
- Refer to CONNECTING BATTERY GROUND LEAD .