Installing The Left And Right Tailgate Hinges
NOTE:
Description is for left component only. Procedure on the right side is identical.
- For replacement: Position the ground cable (2) on hinge and tighten the nut (1).TIGHTENING TORQUES SPECIFICATION
Ground cable on tailgate hinge Hexagon nut with washer tightening torque 2.3 Nm - Position the hinge (3) on the body.
Tighten screws (1) and nuts (2).
TIGHTENING TORQUES SPECIFICATIONTailgate hinge retaining bracket on the body Oval-head screw M8 tightening torque 19 Nm TIGHTENING TORQUES SPECIFICATIONTailgate hinge to body Nut M8 tightening torque 19 Nm
Follow-up work
- Refer to DISCONNECTING ALL BATTERY GROUND LEADS .
- Refer to ADJUSTING THE TAILGATE HINGES .
- Refer to ADJUSTING THE TAILGATE .
- Refer to INSTALLING THE TENSION SPRING FOR THE LEFT TAILGATE .
- Refer to MOUNTING THE HYDRAULIC CYLINDER FOR THE TAILGATE ON THE RIGHT .
- Refer to INSTALLING THE COVER FOR THE WATER CHANNEL .