Install the engine ventilation line of cylinder bank 2
NOTE:
Schematic diagram is for example purposes. Some parts may differ in certain details.
- Insert and position the engine ventilation line (2) .
- Tighten down screws (1) .
TIGHTENING TORQUES SPECIFICATION
| Engine ventilation line | ||
|---|---|---|
| Screw | Tightening torque | 10 Nm |
- Position engine ventilation line (2) .
- Connect and lock retaining clip (1) .
Follow-up work
- Refer to INSTALLING THE TANK VENTILATION LINE OF CYLINDER BANK 2 PARTIALLY .
- Refer to INSTALLING THE SUPPORT BRIDGE .
- Refer to INSTALLING CONDUIT ON BANK 2 .
- Refer to INSTALLING CONDUIT ON BANK 1 .
- Refer to INSTALLING (PARTIAL INSTALLATION) THE EXPANSION TANK FOR THE CHARGE AIR COOLERS .
- Refer to INSTALLING COOLANT EXPANSION TANK .
- Refer to INSTALLING THE HOLDER OF THE DME CONTROL UNIT FOR CYLINDERS 5 TO 8 .
- Refer to ATTACHING THE LAMBDA OXYGEN SENSOR FOR THE CYLINDERS 5 TO 8 .
- Refer to ATTACHING THE LAMBDA OXYGEN SENSOR FOR THE CYLINDERS 1 TO 4 .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to INSTALLING THE COVER PANEL OF THE SLAVE DME CONTROL UNIT .
- Refer to INSTALLING THE COVER PANEL OF THE MASTER DME CONTROL UNIT .