Engine, Installing
Special tools and workshop equipment required
- All special tools listed when removing.
Procedure
- Replace the bolts that were tightened with an additional turn after removing them.
- Replace the self-locking nuts and bolts, gaskets, seals and O-rings after removing.
- Only remove the plugs or caps just before installing the respective lines.
- Secure all hose connections with hose clamps that match the ones used in series production. Refer to the Parts Information.
- Check the vacuum hoses for damage before the assembly and replace if necessary.
- During installation, all cable ties must be installed at the same location.
- Bonded rubber bushings have a limited range of rotation. Only tighten suspension threaded connections when vehicle is in curb weight position or in the control position.
- A new engine or replacement engine is still filled with a residual amount of test cycle oil from the factory. If a new engine or replacement engine is installed, then the test cycle oil must be bled and new engine oil filled before the first start of the engine.
- Secure the engine with the subframe on the : VAS6131B .
Do not place the sensor wheel near magnets (for example lamp base, speakers).
There is a risk of destroying the sensor wheel by magnetic force.
- Before installing the drive plate/flywheel or sensor wheel, check the function of the sensor wheel.
-- Check the sensor wheel for engine speed sensor. Refer to Crankshaft ; check the sensor wheel.
-- Install the transmission on the engine. Refer to the appropriate service information. .
-- Install the engine supports and engine mount. Refer to OVERVIEW - ASSEMBLY MOUNTS .
-- Install the transmission mount. Refer to TRANSMISSION MOUNT, REMOVING AND INSTALLING .
-- Install the ATF cooler. Refer to the appropriate service information. .
-- Bring the subframe into the installation position.
-- Install bracket to the subframe. Refer to OVERVIEW - SUBFRAME .
-- Carefully guide the engine/transmission assembly into the body using the : VAS6131B .
-- Tighten the tunnel crossmember bolts. Refer to the appropriate service information. .
-- Remove the subframe. Refer to OVERVIEW - SUBFRAME .
Further installation is performed in reverse order of removal, while noting the following:
-- Install the parking lock emergency release cable. Refer to the appropriate service information. .
-- Install the steering intermediate shaft. Refer to STEERING INTERMEDIATE SHAFT, REMOVING AND INSTALLING .
-- Install the coupling rod. Refer to OVERVIEW - SUBFRAME .
-- Install the lower control arm. Refer to OVERVIEW - LOWER CONTROL ARM AND BALL JOINT .
-- Install the steering gear boot. Refer to BOOT, REMOVING AND INSTALLING .
-- Install the tie rod end. Refer to OVERVIEW - STEERING GEAR .
-- Install the refrigerant line. Refer to REFRIGERANT CIRCUITRefrigerant Circuit .
-- Install the longitudinal member. Refer to OVERVIEW - LOCK CARRIER
-- Install the coolant pipes. Refer to OVERVIEW - COOLANT PIPES .
-- Install the charge air hose connections. Refer to OVERVIEW - CHARGE AIR HOSE CONNECTIONS .
-- Install the catalytic converters. Refer to OVERVIEW - EMISSIONS CONTROL SYSTEM .
-- Install the parking/auxiliary heater. Refer to the appropriate service information. ; Overview - Parking/Auxiliary Heater Components.
-- Connect the fuel hoses. Refer to CONNECTOR COUPLINGS, DISCONNECTING .
-- Install the air filter housing. Refer to AIR FILTER HOUSING, REMOVING AND INSTALLING .
-- Install the heat shield and engine cover. Refer to ENGINE COVER, REMOVING AND INSTALLING .
-- Install the drive axle heat shield. Refer to DRIVE AXLE HEAT SHIELD, REMOVING AND INSTALLING .
-- Tighten the drive axles. Refer to OVERVIEW - DRIVE AXLE .
-- Install the driveshaft. Refer to the appropriate service information. .
-- Install the exhaust system. Refer to OVERVIEW - MUFFLER .
-- Install the wheel spoiler and wheel housing liner. Refer to OVERVIEW - FRONT WHEEL HOUSING LINER .
-- Mount the front wheels. Refer to WHEEL, CHANGING or to the appropriate service information. .
-- Install the lock carrier cover. Refer to OVERVIEW - BUMPER COVER .
-- Fill the refrigerant circuit. Refer to REFRIGERANT CIRCUIT or REFRIGERANT CIRCUIT, DISCHARGING .
-- Install the subframe shield. Refer to OVERVIEW - SUBFRAME .
-- Wires and connections. Refer to COMPONENT LOCATION OVERVIEW - RELAY PANELS, FUSE PANELS AND E-BOXES and => Wiring Diagram.
-- If necessary, bleed the test cycle oil. Refer to ENGINE, INSTALLING => .
-- Fill the engine oil:
- RS6. Refer to => 501Maintenance Work; Engine Oil: Fill
- RS7. Refer to => 450Maintenance Work; Engine Oil: Fill
-- Install the plenum chamber bulkhead. Refer to PLENUM CHAMBER BULKHEAD, REMOVING AND INSTALLING .
-- Follow all steps after connecting the battery. Refer to BATTERY, DISCONNECTING AND CONNECTING .
There is a risk of destroying the control modules due to excessive voltage.
- Do not use a battery charger to jump start!
-- Perform adaptations after replacing the engine Vehicle Diagnostic Tester 0001 - Engine Electronics, Functions .
-- Connect the coolant hoses/coolant ventilation line with the connector coupling. Refer to Fig 1.
- Used coolant cannot be used again.
-- Fill with coolant. Refer to Coolant, Filling .
-- Install the underbody trim panels. Refer to OVERVIEW - UNDERBODY TRIM PANELS .
-- Install the noise insulation. Refer to OVERVIEW - NOISE INSULATION .
Tightening Specifications
- The tightening specifications only apply to lightly greased, oiled, phosphated or blackened nuts and bolts.
- Additional lubricants, such as engine or transmission oil are permitted, although lubricants containing graphite are not.
- Do not use any ungreased parts.
- Tightening specification tolerance: ±15%.
| Component | Nm | ||
|---|---|---|---|
| Bolts and Nuts | M6 | 9 | |
| M7 | 15 | ||
| M8 | 20 | ||
| M10 | 40 | ||
| M12 | 65 | ||