LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2021 >> Camry LE, FWD >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Control System (A25A-FKS) - Service Information (Except Hybrid) >> ECM >> Installation [03/2017 - ] >> Procedure

Installation [03/2017 - ]: Procedure

  1. INSTALL NO. 2 ECM BRACKET 
    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque: 4.5 N*m (46 kgf*cm, 40 in.*lbf) 

  2. INSTALL NO. 1 ECM BRACKET 
    1. Install the No. 1 ECM bracket to the ECM with the 2 screws.

      Torque: 4.5 N*m (46 kgf*cm, 40 in.*lbf) 

  3. INSTALL ECM 
    1. Install the ECM with the 2 bolts and nut.

      Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf) 

      NOTE:

      If the ECM has been struck or dropped, replace it.

    2. Connect the 3 ECM connectors and rotate the 3 levers to lock them.
      GTY754310Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      NOTE:
      • When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water and other foreign matter.
      • Be sure to securely connect the ECM connectors.
  4. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE 

    Refer to PROCEDURE - Step 44 [03/2017 - 06/2017] , or refer to PROCEDURE - Step 44 [06/2017 - 08/2018] , or refer to PROCEDURE - Step 44 [08/2018 - 03/2020] , or refer to PROCEDURE - Step 48 [03/2020 - 10/2020] , or refer to PROCEDURE - Step 48 [10/2020 - ]

  5. INSTALL INLET AIR CLEANER ASSEMBLY 

    Refer to PROCEDURE - Step 45 [03/2017 - 06/2017] , or refer to PROCEDURE - Step 45 [06/2017 - 08/2018] , or refer to PROCEDURE - Step 45 [08/2018 - 03/2020] , or refer to PROCEDURE - Step 49 [03/2020 - 10/2020] , or refer to PROCEDURE - Step 49 [10/2020 - ]

  6. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 46 [03/2017 - 06/2017] , or refer to PROCEDURE - Step 46 [06/2017 - 08/2018] , or refer to PROCEDURE - Step 46 [08/2018 - 03/2020] , or refer to PROCEDURE - Step 50 [03/2020 - 10/2020] , or refer to PROCEDURE - Step 50 [10/2020 - ]

  7. INSTALL COOL AIR INTAKE DUCT SEAL 

    Refer to PROCEDURE - Step 2 [03/2017 - 06/2017] , or refer to PROCEDURE - Step 2 [06/2017 - 10/2020] , or refer to PROCEDURE - Step 2 [10/2020 - ]

  8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Refer to PROCEDURE - Step 2 [03/2017 - 08/2018] , or refer to PROCEDURE - Step 2 [08/2018 - ]

  9. PERFORM INITIALIZATION 

    Refer to PRECAUTION [03/2017 - 06/2017] , or refer to PRECAUTION [06/2017 - 03/2020] , or refer to PRECAUTION [03/2020 - 10/2020] , or refer to PRECAUTION [10/2020 - ]