LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2019 >> Highlander Limited, FWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 18 (Engine Cooling System (1AR-FE) (Service Information) (Except Hybrid)) >> Cooling Fan Motor >> Installation [12/2013 - ] >> Procedure

Installation [12/2013 - ]: Procedure

WARNING: This page is about a different variant/trim than selected.
  1. INSTALL NO. 2 COOLING FAN MOTOR 
    1. Install the No. 2 cooling fan motor with the 3 screws.

      Torque: 2.6 N*m (27 kgf*cm, 23 in.*lbf) 

    2. Connect the No. 2 cooling fan motor connector and engage the wire harness to the 2 clamps.
  2. INSTALL COOLING FAN MOTOR 
    1. Install the cooling fan motor with the 3 screws.

      Torque: 2.6 N*m (27 kgf*cm, 23 in.*lbf) 

    2. Connect the cooling fan motor connector and engage the wire harness to the 2 clamps.
  3. INSTALL NO. 2 FAN 
    NOTE:

    Do not reverse the position of the fan and No. 2 fan when installing them. Doing so may damage the parts.

    1. Install the No. 2 fan with the nut.

      Torque: 6.3 N*m (64 kgf*cm, 56 in.*lbf) 

  4. INSTALL FAN 
    NOTE:

    Do not reverse the position of the fan and No. 2 fan when installing them. Doing so may damage the parts.

    1. Install the fan with the nut.

      Torque: 6.3 N*m (64 kgf*cm, 56 in.*lbf) 

  5. INSTALL FAN SHROUD ASSEMBLY 
    1. Engage the 3 guides.
    2. Engage the 3 claws to install the fan shroud assembly to the radiator assembly.
      NOTE:

      Do not damage the radiator assembly when installing the fan shroud assembly.

    3. Engage the 4 wire harness clamps.
    4. Connect the cooling fan ECU connector.
  6. CONNECT RADIATOR RESERVE TANK HOSE 
    1. Connect the radiator reserve tank hose.
  7. CONNECT NO. 1 RADIATOR HOSE 
    1. Connect the No. 1 radiator hose and slide the clip to secure it.
  8. INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 4 , or refer to PROCEDURE - Step 4

  9. INSTALL HOOD LOCK ASSEMBLY 

    Refer to PROCEDURE - Step 2 , or refer to PROCEDURE - Step 2

  10. INSTALL BATTERY 

    Refer to PROCEDURE - Step 46 , or refer to PROCEDURE - Step 46

  11. INSTALL INLET AIR CLEANER ASSEMBLY 

    Refer to PROCEDURE - Step 52 , or refer to PROCEDURE - Step 52

  12. INSTALL RADIATOR GRILLE 

    Refer to INSTALLATION [12/2013 - 11/2016] , or refer to INSTALLATION [11/2016 - ]

  13. ADD ENGINE COOLANT 

    See step  2 , or see step  2

  14. INSPECT FOR COOLANT LEAK 

    Refer to PROCEDURE - Step 1

  15. INSTALL NO. 1 ENGINE UNDER COVER 

    Refer to PROCEDURE - Step 81 , or refer to PROCEDURE - Step 81