Installation [11/2015 - ]: Procedure
- INSTALL REAR AXLE HUB AND BEARING ASSEMBLY
- Install the rear axle hub and bearing assembly to the rear axle beam assembly with the 4 bolts.
Torque: 90 N*m (918 kgf*cm, 66 ft.*lbf)
- Install the rear axle hub and bearing assembly to the rear axle beam assembly with the 4 bolts.
- INSPECT REAR AXLE HUB BEARING LOOSENESS
See step 5
- INSPECT REAR AXLE HUB RUNOUT
See step 6
- INSTALL REAR BRAKE DRUM SUB-ASSEMBLY
Refer to PROCEDURE - Step 8
- CONNECT SKID CONTROL SENSOR WIRE
Refer to PROCEDURE - Step 5
- INSTALL REAR WHEEL
Torque: 103 N*m (1050 kgf*cm, 76 ft.*lbf)
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
- Connect the cable to the negative (-) auxiliary battery terminal (Refer to PROCEDURE - Step 2 , or refer to PROCEDURE - Step 2 ).
- Connect the reservoir level switch connector.
- Clear the DTCs (Refer to DTC CHECK / CLEAR [11/2015 - ] ).
- INSPECT REAR WHEEL ALIGNMENT
(Refer to INSPECTION [11/2015 - 06/2017] , or refer to INSPECTION [06/2017 - ] )
- CHECK FOR SPEED SENSOR SIGNAL
(Refer to TEST MODE PROCEDURE [11/2015 - ] )