Installation [11/2015 - 06/2017]: Procedure
- INSTALL AUXILIARY BATTERY
- Install the battery insulator.
- Install the battery.
- Connect the battery ventilation hose to the battery without kinking it.
HINT:
Push in the battery ventilation hose to the battery until a click sound is heard.
- Connect the positive (+) battery terminal with the nut.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
- Install the battery terminal cap.
- Install the battery clamp with the 2 nuts.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
- Connect the negative battery terminal with the nut.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
NOTE:When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [11/2015 - 06/2017] ).
- Connect the negative battery terminal with the nut.
- INSTALL FRONT FLOOR COVER RH
Refer to PROCEDURE - Step 7