Installation [02/2014 - 11/2016]: Procedure
WARNING: This page is about a different variant/trim than selected.
- INSTALL PURGE VALVE (PURGE VSV)
- Install the purge valve (purge VSV) to the cylinder head sub-assembly with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the fuel vapor feed hose assembly to the purge valve (purge VSV) and slide the clip to secure it.
HINT:
Engage the clip within the area shown in the illustration.
*1 Fuel Vapor Feed Hose Assembly *2 No. 1 Fuel Vapor Feed Hose *a 2 to 7 mm (0.0787 to 0.276 in.) *b 120° *c RH *d Paint Mark - Connect the No. 1 fuel vapor feed hose to the purge valve (purge VSV).
- Engage the wire harness clamp.
- Connect the purge valve (purge VSV) connector.
- Install the purge valve (purge VSV) to the cylinder head sub-assembly with the bolt.
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 68 , or refer to PROCEDURE - Step 67
- INSTALL INLET NO. 2 AIR CLEANER
Refer to PROCEDURE - Step 5
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 4
- INSTALL RADIATOR SIDE SEAL RH
Refer to PROCEDURE - Step 5
- INSTALL RADIATOR SIDE DEFLECTOR SEAL LH
Refer to PROCEDURE - Step 6