Preliminary Work For Cylinder Head 4-6
WARNING: This page does not describe the selected car, but rather 10 other vehicles, including the 2012 Porsche Cayman, 2012 Porsche Boxster, 2011 Porsche Cayman, 2011 Porsche Boxster, and 2010 Porsche Cayman. However, it is still accessible from the selected car via links, so may be relevant.
- Remove the engine.
→ Removing Engine .
- Completely remove intake-air distributor.
→ Removal .
- Remove hydraulic return line for power steering from the oil/water heat exchanger and pull it out of the holder.
- Pull off positive crankcase ventilation line.
- Remove positive crankcase ventilation cover on the cylinder head.
- Positive crankcase ventilation cover
- O-ring, always replace
- External Torx screw, M6
- Remove vacuum pump.
- Remove cylinder head cover.
- Remove camshafts.