LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2016 >> 911 Turbo, 2D Convertible >> Repair and Diagnosis >> External Pages >> Different car >> Section 113 (19 - Engine - Cooling -- CARRERA (997)) >> WM 194519 Removing And Installing Additional Coolant Pump (Turbo Coupe, Turbo CABRIO & Gt2) >> Preliminary Work

Preliminary Work

WARNING: This page does not describe the selected car, but rather 9 other vehicles, including the 2013 Porsche 911, 2012 Porsche 911, 2011 Porsche 911, 2010 Porsche 911, and 2009 Porsche 911. However, it is still accessible from the selected car via links, so may be relevant.
  1. Disconnect battery.

    → 2X00IN02 WORK INSTRUCTIONS AFTER DISCONNECTING THE BATTERY .

  2. Remove pressure pipe.

    → 214119 REMOVING AND INSTALLING PRESSURE PIPE  .

  3. Remove air cleaner housing.

    → 242419 REMOVING AND INSTALLING AIR-CLEANER ELEMENT  .

    WARNING: Danger of objects or loads falling down
    • Risk of squashing or crushing

    → Secure components to prevent them from falling down.

  4. Lower the engine.

    Lower the engine by max. 40 mm. 

    Support the engine with a jack and Retainer Plate 9592  .

    Loosen and screw off M12 collar nuts on the engine mounting. Carefully lower the engine using the jack.

  5. Remove fuel filter.

    → 206019 REMOVING AND INSTALLING FINE FUEL FILTER  .

  6. Remove secondary-air pump.

    → 26651900 REMOVING AND INSTALLING SECONDARY-AIR PUMP .

  7. Remove oil-filter console.

    → 173319 REMOVING AND INSTALLING OIL-FILTER CONSOLE  .

  8. Remove intake-air distributor, side 1-3.

    → 244620 REMOVING AND INSTALLING INTAKE-AIR DISTRIBUTOR  .

  9. Remove shut-off valve.

    → 266919 REMOVING AND INSTALLING SHUT-OFF VALVE  .