LEMON Manuals: Even more car manuals for everyone
Home >> Pontiac >> 2009 >> G8 Base >> Repair and Diagnosis >> Transmission >> Hydraulic Diagrams >> Automatic Transmission - 5L40-E - Removal & Installation, Service, Overhaul, Troubleshooting & Diagnosis >> Shift Control Linkage Replacement >> Installation Procedure

Installation Procedure

    Fig 1: Identifying Shift Selector Linkage Rod To Shift Selector Shaft Retaining Nut
    GM1958702Courtesy of GENERAL MOTORS CORP.
  1. Install the shift selector linkage rod (1) to the shift selector shaft (2).
  2. CAUTION: Refer to Fastener Caution .
  3. Install the shift selector linkage rod to shift selector shaft retaining nut (3) and tighten to 9 N.m (80 lb in).
  4. Fig 2: Identifying Shift Control Linkage Rod
    GM1954218Courtesy of GENERAL MOTORS CORP.
  5. Connect the shift control linkage rod to the shift control assembly.
  6. Install the nut to the shift control linkage rod.
  7. Adjust the shift control linkage. Refer to Shift Control Linkage Adjustment .
  8. Lower the vehicle.