Removal and Installation: Removal
WARNING: This page is about a different variant/trim than selected.
- Disconnect bank 2 crankcase breather hose from rocker cover.
- Disconnect EVAP canister purge control solenoid valve hose from EVAP canister purge control solenoid valve.
- Loosen air duct clamps from resonator, intake manifold, and air cleaner case. Refer to Exploded View .
- Remove air duct and set aside.
- Disconnect the harness connector from the EVAP canister purge control solenoid valve.
- Disconnect bank 1 and bank 2 PCV hoses from intake manifold.
- Loosen electronic throttle control actuator bolts in reverse of the order shown and reposition the electronic throttle control actuator.
Courtesy of NISSAN NORTH AMERICA, INC.
CAUTION:- Handle carefully to avoid any impact to electric throttle control actuator.
- Do not disassemble.
NOTE: The figure shows the electric throttle control actuator viewed from the air duct side. - Remove heater pipe (inlet) bolts and reposition heater pipe (inlet). Refer to Exploded View .
- Loosen bolts in the reverse order as shown.
: Engine front
- Remove intake manifold.
- Remove intake manifold gaskets.CAUTION:
- Do not reuse intake manifold gaskets.
- Cover engine openings to avoid entry of foreign materials.
- Remove the following parts (if necessary).
- EVAP canister purge control solenoid valve
- EVAP canister purge control solenoid valve hose
- Cap