LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2025 >> S580 >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Air Intake, Turbocharging (1 Of 2) -- 223 Chassis >> Testing & Repair >> Remove/Install Check Valve On Charge Air Line - AR09.41-P-8970SB

Remove/Install Check Valve On Charge Air Line - AR09.41-P-8970SB

Engine 256.9 in model 223 

with code M016 (Uprated engine) 

Fig 1: Check Valve On Charge Air Line Components Location - Engine 256.9 In Model 223 With Code M016
G16190271Courtesy of MERCEDES-BENZ USA
WARNING Risk of injury  . Skin or eye injuries may result when handling hot or glowing objects. Wear protective gloves, protective clothing and safety glasses, if necessary. AS00.00-Z-0002-01A
CAUTION Risk of injury  caused by scraping or cutting body parts on sharp vehicle parts Always wear protective gloves when working on or near sharp and non-deburred vehicle parts.
Deburr repair panels.
AS00.00-Z-0017-01A
Topical note  Information on preventing damage to electronic components due to electrostatic discharge   AH54.00-P-0001-01A
Topical note  Notes on avoiding damage through contamination and foreign objects   AH00.00-P-5000-01A
REMOVINGINSTALLING Remove/install     
1 Remove the catalytic converter.   AR49.20-P-0100S
2 Remove charge air line from the check valve (1) to the additional compressor (A64).   AR09.41-P-8952SB 
3 Disconnect and release electrical connector (2) at charge air pressure/temperature sensor (B159).    
4 Remove bleed line (3) from the check valve (1).    
5 Release screw clamp (5). TORQUE SPECIFICATION Screw clamp, boot to exhaust gas turbocharger *BA09.41-P-1010-01MRT 
6 Remove screw (7). TORQUE SPECIFICATION Screw, check valve to chain case cover *BA09.41-P-1011-01MRT 
7 Detach check valve (1) with boot (6) from the exhaust gas turbocharger and remove it in a forward direction. INSTALLATION IMPORTANT : Slide on new boot (6) up to the end stop.
Align marking on the new boot (6) with the arrow on the exhaust gas turbocharger.
 
8 Remove boot (6) from the check valve (1). INSTALLATION IMPORTANT : Wet inside area of the new boot (6) with lubricant.
INSTALLATION IMPORTANT : Install new boot (6) together with screw clamps (4, 5).
Lubricant, rubber assembly 1 L
*BR00.45-Z-1010-06A 
    TORQUE SPECIFICATION Screw clamp, boot to exhaust gas turbocharger *BA09.41-P-1010-01MRT 
9 Remove charge air pressure/temperature sensor (B159). When installing new check valve (1). AR09.41-P-2014SB 
10 Install in the reverse order.    
CHARGE AIR PIPE/CHARGE AIR COOLING

Number Designation Engine 256.9
BA09.41-P-1010-01MRT Screw clamp, boot to exhaust gas turbocharger Nm 6
CHARGE AIR PIPE/CHARGE AIR COOLING

Number Designation Engine 256.9
BA09.41-P-1011-01MRT Screw, check valve to chain case cover Nm 10
REPAIR MATERIALS

Number Designation Order number
BR00.45-Z-1010-06A Lubricant, rubber assembly 1 L A 000 989 03 67