Wiring Diagram For Battery Management Control Unit - PE54.10-P-2104FBB
Model 205
up to model year 2019
with code ME06 (Hybrid drive 60 kW variant (incl. plugin))
except code ME04 (Mild hybrid drive)
| Wiring diagram for battery management control unit | PE54.10-P-2104-97FBB | ||
| Location and assignment of line and plug connectors | GF00.19-P-1000FBA | ||
| Location and assignment of ground points | GF00.19-P-2000FBA | ||
| Location and assignment of Z connector sleeves (wiring and plug connectors in wiring harness) | GF00.19-P-3000FBA | ||
| Abbreviations of signal and circuit designations for wiring diagrams | OV00.01-P-1001-28FBA | ||
| Use of wiring diagrams | OV00.01-P-1901-03FBA | ||
| Search aid for all electrical components | OV00.01-P-1909FBA |