LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 1995 >> E420 >> Repair and Diagnosis >> External Pages >> Different car >> Section 18 (Engine Timing - 140 Chassis) >> Repair & Adjustments >> Removing and installing crankshaft sprocket - RA05001044600X(05-4600)

Removing and installing crankshaft sprocket - RA05001044600X(05-4600)

WARNING: This page does not describe the selected car, but rather 42 other vehicles, including the 1999 Mercedes-Benz S600, 1999 Mercedes-Benz S500, 1999 Mercedes-Benz S420, 1999 Mercedes-Benz S320, and 1999 Mercedes-Benz CL600. However, it is still accessible from the selected car via links, so may be relevant.

Preceding work:

Oil sump removed (01-3100) .

Tensioning rail removed (05-3300) .

Guide rail removed (05-3350) .

Fig 1: Identifying Crankshaft Sprocket Remove/Install Components
G04677575Courtesy of MERCEDES-BENZ OF NORTH AMERICA.
Oil pump drive gear (6) at oil pump (7) unbolt, bolt on (32 Nm).
Oil pump chain (8) and oil pump drive gear (6) remove, install.
NOTE: Pay attention to installation of oil pump drive gear (6) (18-2100) .
Tensioning bar (9), bush (10) and spring (13) pull off, fit on.
Timing chain (14) remove, install.
Crankshaft sprocket (11) pull off with puller (06) 615 589 01 33 00.
Parallel keys (12) note.
Crankshaft sprocket (11) heat, fit on.

Special tool 

Fig 2: Identifying Special Tool (615 589 01 33 00)
G04677576Courtesy of MERCEDES-BENZ OF NORTH AMERICA.